Project 11
Wire and test one single-pole switch controlling one listed light fixture on an approved de-energized branch circuit, completing the switch loop, fixture connections, grounding path, and mounting so the finished assembly turns the light on and off reliably from a single location.
These cues appear at the point of work. They identify safety, code, manufacturer, and measurement issues before they become shock, arc flash, or a switch and fixture assembly that fails inspection.
Task-specific safety guidance for ordinary work hazards.
Serious injury, shock, electrocution, or arc flash is possible.
Practical work-area safety: lighting, footing, access, and housekeeping.
Local requirements vary. Verify permit, inspection, and jurisdictional rules.
Follow product-specific instructions for switches, fixtures, and support hardware.
Reference-point, verification, and test-sequence guidance.
This project qualifies you to wire and test one single-pole switch controlling one listed light fixture on a de-energized, previously verified branch circuit. The finished work product is one operating switch-and-fixture assembly: a correctly identified switch loop, a fixture connected and supported according to its listing, a continuous equipment-grounding path, and a documented functional test confirming the light turns on and off reliably from the single switch location.
You will verify the circuit de-energized, identify the incoming supply, switched leg, grounded conductor, and equipment-grounding conductors at both the switch box and the fixture box, splice the grounded conductor continuously to the fixture without landing it on the switch, connect the switch and fixture terminations, mount the switch and fixture, restore power under the approved sequence, and cycle the switch to confirm correct, flicker-free operation.
This project builds directly on the box installation of Chapters 3 and 4, the cable routing of Chapter 6, the splicing and pigtailing of Chapter 7, and the grounding and bonding work of Chapter 8. It prepares you for the three-way switching circuit in Chapter 12, which extends this same switch-loop and fixture-wiring discipline to two switch locations.
Every switch-controlled lighting circuit in a home depends on the same switch-loop discipline taught here: identify the supply and switched leg correctly, keep the grounded conductor off the ordinary single-pole switch, and maintain a continuous equipment-grounding path through both boxes. The mistake most often responsible for a switch that appears to work but fails inspection or causes an intermittent fault is confusing the switched-leg conductor with the incoming supply, or landing a neutral on a switch terminal by assumption rather than by verified identification.
The de-energized termination and controlled-restoration sequence used here is the same sequence used for every device chapter in this book, and the switch-loop identification skill carries forward directly into the two-location switching taught in Chapter 12.
This project covers:
This project does not authorize the learner to:
Any switch, fixture, box, or conductor condition that fails verification in this chapter must be corrected, repaired, or escalated to a qualified professional before work continues.
Establish these references before any splicing or termination begins, and do not change the defined conductor identification mid-project.
| Term | Definition |
|---|---|
| Incoming supply | The ungrounded conductor bringing power into the switch box from the source, connected to one switch terminal |
| Switched leg | The ungrounded conductor carrying power from the switch to the fixture only when the switch is closed, connected to the other switch terminal and to the fixture's ungrounded lead |
| Grounded conductor | The conductor spliced continuously from source to fixture neutral, never landed on an ordinary single-pole switch terminal |
| Equipment-grounding conductor | The conductor and bonding path connecting the metal boxes, switch yoke, and fixture grounding parts to the branch circuit's grounding system |
| Switch loop | The complete two-conductor-plus-grounding wiring path between the switch box and the fixture box that allows the switch to control the fixture |
| Stop-work condition | Any observed hazard, test failure, or unidentified condition that must halt the project until corrected or escalated, defined in this chapter's failure-point section |
Before splicing or terminating any conductor, record the identified conductors directly on the Switch and Fixture Wiring Worksheet:
Switch box location: ______ Fixture box location: ______ Circuit / breaker identifier: ______
Incoming supply conductor identified: ______ (Yes/No) Switched-leg conductor identified: ______ (Yes/No) Fixture weight and box listing confirmed: ______ (Yes/No)
Every switch-and-fixture project in this book depends on correctly separating two jobs performed by the ungrounded conductors: bringing power to the switch, and carrying power onward to the fixture only when the switch is closed. The grounded conductor and equipment-grounding conductor pass through both boxes without being interrupted by the switch itself.
Before splicing or terminating any conductor, identify the incoming supply, switched leg, grounded conductor, and equipment-grounding conductors at both the switch box and the fixture box, using the approved wiring diagram and, where permitted, reidentification methods required by the wiring method. Splice the grounded conductor continuously from source to fixture neutral. Do not place the grounded conductor on an ordinary single-pole switch terminal at any point in this project.
Confirm the incoming supply and switched-leg conductors against the approved wiring diagram before making any splice or termination. Do not rely on cable jacket color, conductor position in the box, or assumption from a similar past job as proof of a conductor's function.
Do not remove the switch box or fixture box cover, and do not touch any conductor, until the circuit has been verified de-energized using the live-dead-live test established in Chapter 1. Treat every conductor as energized until that test proves otherwise.
Establish a stable ladder or platform setup before working at the fixture box, and support the fixture independently of the conductors while making connections. A fixture left hanging by its conductors can stress terminations and create a later intermittent fault.
Install only the fixture, mounting bracket, and lamp type specified by the fixture's listing, and confirm the box and support are listed for the fixture's weight before mounting. A fixture heavier than its support is listed to carry, or a lamp exceeding the fixture's rated wattage, is a stop-work condition until corrected.
EL-061 – EL-066
Switch Loop / Fixture Termination / Grounding / Mounting / Functional Test Qualification
Quantity: one single-pole switch correctly wired to one light fixture, with continuous grounded-conductor splicing, a bonded equipment-grounding path through both boxes, the fixture mounted to a listed and adequately rated support, and a completed functional test confirming correct switching and fixture operation, documented on one completed Switch and Fixture Wiring Worksheet.
| Item | Target Condition | Verification Method |
|---|---|---|
| De-energization | Circuit verified de-energized by live-dead-live test before any cover is removed | Direct test and worksheet record |
| Conductor identification | Incoming supply, switched leg, grounded, and equipment-grounding conductors identified at both boxes | Comparison to approved wiring diagram |
| Grounding continuity | Grounded conductor spliced continuously to fixture neutral; equipment-grounding path bonded through both boxes | Visual inspection and de-energized continuity check |
| Switch termination | Incoming supply and switched leg landed on separate switch terminals using listed methods | Visual inspection |
| Fixture termination | Switched conductor to ungrounded fixture lead, grounded conductor to fixture neutral lead | Visual inspection |
| Support verification | Fixture box and support listed for the fixture's weight and type | Manufacturer listing check |
| Functional test | Switch cycles the fixture on and off correctly with no flicker after restoration | Direct observation after energization |
| Check | Standard |
|---|---|
| Conductor identification | Incoming supply, switched leg, grounded, and equipment-grounding conductors correctly identified and confirmed against the approved diagram before termination |
| Grounding path | Continuous grounded-conductor splice to the fixture neutral and a bonded, continuity-verified equipment-grounding path through both boxes |
| Termination quality | No exposed copper beyond the connector or terminal, no loose strands, no insulation trapped under a terminal |
| Box fill and folding | Box fill verified adequate after all connectors, pigtails, and devices are accounted for, with conductors folded into the box without stress |
| Mounting | Switch mounted square to the box; fixture mounted to a support listed for its weight and type, without trapping conductors |
| Functional test | Switch operates the fixture correctly from every cycle tested, with no flicker, abnormal heat, or intermittent operation |
| Documentation | Switch and Fixture Wiring Worksheet complete with conductor identification, connections, and test results |
Inspect every completed switch-and-fixture assembly using the same checks regardless of the room or fixture type involved.
Complete the Switch and Fixture Wiring Worksheet in the Inspection Checklist section below before beginning Project 12.
Probable cause: the switched-leg and incoming-supply conductors were reversed at the switch, a splice is loose, or the lamp is defective.
Confirmation: de-energize and verify absence of voltage, then inspect the switch terminations against the approved diagram and check the lamp and fixture connections.
Correction: correct the switch termination if conductors were reversed, re-make any loose splice using a listed connector, or replace a defective lamp.
Reinspection: repeat the live-dead-live test, re-terminate as needed, restore power, and retest switching operation.
Probable cause: a loose terminal, an undersized or damaged splice, or a conductor stressed during folding into the box.
Confirmation: de-energize and verify absence of voltage, then inspect every termination and splice at the switch and fixture boxes for looseness or damage.
Correction: re-terminate or re-splice the affected conductor using the manufacturer-controlled method and torque, and fold conductors into the box without stress.
Reinspection: repeat the live-dead-live test, restore power, and cycle the switch to confirm flicker-free operation.
Probable cause: the grounded conductor was inadvertently landed on a switch terminal, or an ungrounded and grounded conductor are in unintended contact at one of the boxes.
Confirmation: de-energize and verify absence of voltage, then inspect the switch box and fixture box for a grounded conductor connected to a switch terminal or evidence of contact between conductors.
Correction: correct the wiring error, re-insulate or re-splice any conductor in unintended contact with another, and confirm proper conductor identification before restoring power.
Reinspection: repeat the live-dead-live test, restore power, and retest switching operation before considering the circuit complete.
Probable cause: the fixture exceeds the box or support's listed weight rating, or the mounting bracket was not fully engaged.
Confirmation: de-energize, support the fixture independently, and inspect the box, support, and bracket engagement against the fixture's listed weight.
Correction: install a fixture-rated box or support if the current box is inadequate, or correctly engage the mounting bracket per its instructions.
Reinspection: repeat the support verification and functional test before leaving the fixture in service.
Probable cause: a missing or loose grounding pigtail, an unbonded metal box, or a fixture grounding lead not connected.
Confirmation: de-energize and verify absence of voltage, then trace the equipment-grounding path from the fixture through the switch box to the branch circuit's grounding system.
Correction: install or re-terminate the missing pigtail, bonding screw, or fixture ground connection using listed hardware.
Reinspection: repeat the de-energized continuity check before restoring power.
This project ends with the switch and fixture assembly tested, documented, and left in normal service, not disturbed further until the next assigned project begins.
| Competency | Independent Pass Standard | Not Demonstrated | With Assistance | Independently |
|---|---|---|---|---|
| EL-061 | Wires a switch loop, correctly identifying the incoming supply and switched-leg conductors at the switch box | |||
| EL-062 | Connects fixture conductors, splicing the grounded conductor continuously and landing the switched leg on the fixture's ungrounded lead | |||
| EL-063 | Mounts the light fixture using a box and support listed for the fixture's weight and type | |||
| EL-064 | Installs the switch device, terminating conductors using listed terminal methods and mounting the switch square to the box | |||
| EL-065 | Tests switching operation, confirming correct switching, fixture operation, and absence of flicker after restoration of power | |||
| EL-066 | Inspects device and fixture boxes for correct grounding, box fill, splice quality, and support before and after energization |
Mark one column per competency. Only Demonstrated Independently awards the competency; Demonstrated with Assistance authorizes additional supervised practice but does not complete the requirement.
| Item | Target Condition | Result | Pass/Fail | Correction (if any) |
|---|---|---|---|---|
| De-energization | Verified by live-dead-live test before any cover was removed | |||
| Conductor identification | Incoming supply, switched leg, grounded, and equipment-grounding conductors identified at both boxes | |||
| Grounding continuity | Grounded conductor spliced continuously to fixture neutral; equipment-grounding path bonded and continuity-verified | |||
| Switch termination | Incoming supply and switched leg landed on separate switch terminals | |||
| Fixture termination | Switched conductor to ungrounded lead, grounded conductor to neutral lead | |||
| Support verification | Fixture box and support listed for the installed fixture's weight and type | |||
| Functional test | Switch cycles the fixture correctly with no flicker or abnormal heat |
Unresolved conditions and correction plan: ____________________________________________
Assembly declared ready: ______ (Pass/Fail) Date: ____________ Builder name: ____________
With the conductors identified, grounding path completed, switch and fixture terminated and mounted, and power restored, review the finished assembly against the Acceptance Standards table and confirm the incoming supply and switched-leg conductors are correctly landed, the grounded conductor is spliced continuously to the fixture without being landed on the switch, the equipment-grounding path is continuous and bonded, the fixture is mounted to a support listed for its weight, and the switch reliably turns the fixture on and off with no flicker, heat, or intermittent operation. Complete the Switch and Fixture Wiring Worksheet and correct any failed item before beginning Project 12. If an item fails, identify whether the error occurred in conductor identification, grounding continuity, switch termination, fixture termination, or support selection before correcting it and re-running the affected check.
You have completed the eleventh project in the residential electrical sequence: wiring and testing a single-pole switch controlling one light fixture. This project required you to identify the incoming supply, switched leg, grounded conductor, and equipment-grounding conductors, splice the grounded conductor continuously to the fixture, terminate the switch and fixture correctly, mount both components to their listed supports, and verify correct, flicker-free switching operation after restoration of power (EL-061 through EL-066).
You now have a repeatable switch-loop identification and fixture-termination system, plus a documented wiring record you can reference for every later switching project in this book. That system carries directly into the next project: wiring a three-way switching circuit that controls one light from two locations.
Keep your Switch and Fixture Wiring Worksheet and approved wiring diagram. You will reuse this exact conductor-identification and grounding discipline, extended to two switches and two traveler conductors, in Project 12.