Project 10
Install one listed insulated flexible-duct branch between an approved takeoff collar and a supply-register boot, using the exact size, route, support, and closure system supplied by the approved design, so the branch delivers air without collapse, excessive sag, or leakage.
These cues appear at the point of work. They identify safety, code, manufacturer, and measurement issues before they become a collapsed branch, a leaking connection, or a blocked opening.
Task-specific safety guidance for ordinary work hazards.
Serious injury, shock, or exposure hazard is possible.
Practical work-area safety: lighting, footing, access, and housekeeping.
Local requirements vary. Verify permit, inspection, and jurisdictional rules.
Follow product-specific instructions for duct, collars, closures, and supports.
Reference-point, verification, and documentation guidance.
This project qualifies you to install one listed insulated flexible-duct branch between an approved takeoff collar and a supply-register boot. The finished work product is one fully connected, sealed, supported, and airflow-tested flexible-duct branch installed to the exact diameter, length, route, support spacing, and closure system supplied by the approved design.
You will confirm the branch size and route from the approved design; mark support points and the shortest practical route; extend the duct to its intended length before cutting; cut the outer jacket, insulation, and inner liner without damaging the liner; connect and seal the inner liner at both the takeoff collar and the register boot; pull insulation over each sealed connection and close the outer jacket; support the duct at the required spacing without compressing the insulation; form long-radius bends while avoiding kinks and crushing; and inspect the completed branch under airflow.
This project builds directly on the duct system map from Project 1, the shutdown procedure from Project 2, the duct-sealing skills from Project 6, and the duct-insulation skills from Project 7. It supplies the flexible-branch method referenced by the Chapter 20 capstone.
Flexible-duct branch installation connects the duct-sealing skills of Project 6 and the duct-insulation skills of Project 7 to a single completed supply run, using the register-boot installation from Project 8 as its termination point. The same cut, connect, seal, jacket, and support sequence taught here is the sequence used for every flexible branch built in the Chapter 20 capstone practice system.
This project depends on the approved design supplying the branch diameter, length, route, bend limits, support spacing, and closure system. It does not authorize sizing or rerouting a branch based on comfort symptoms alone; that determination belongs to the approved design or a qualified professional.
This project covers:
This project does not authorize the learner to:
Any concealed utility, structural restriction, moisture damage, or unknown material found during layout must be recorded and escalated before cutting or fastening continues.
Establish these references before beginning the branch layout, and do not change the approved route or diameter mid-project.
| Term | Definition |
|---|---|
| Takeoff collar | The fitting on the supply plenum or trunk to which the flexible duct's inner liner is connected |
| Inner liner | The airtight interior duct surface of the flexible duct through which air travels |
| Outer jacket | The exterior vapor-facing layer covering the flexible duct's insulation |
| Extended length | The duct's length when fully stretched to its intended installed condition, measured before final cutting |
| Support spacing | The maximum distance between wide approved straps, as specified by the approved design or manufacturer instructions |
| Long-radius bend | A gradual change in direction that does not reduce the duct's internal diameter or crease the inner liner |
Before beginning the layout, record the approved branch specification directly on the worksheet:
Branch location / register served: ______ Approved diameter: ______ in. Approved maximum length: ______ ft
Takeoff collar location: ______ Register boot location: ______ Support spacing per design or manufacturer instructions: ______ Date started: ____________
A flexible-duct branch performs only as well as its weakest connection and its worst-supported span. This project treats the layout, the cut, the two liner connections, the jacket closure, and the support spacing as five separate checkpoints, each with its own pass condition.
The branch diameter, length, route, bend limits, support spacing, and closure system must come from the approved design. Do not select or change any of these values based on comfort symptoms, convenience of routing, or leftover material. If the approved design is incomplete or does not match field conditions, stop and obtain a corrected design before cutting any duct.
Extend the flexible duct to its full intended length before marking or cutting. A duct cut while compressed will be too short once installed, forcing tight connections and increasing the risk of kinking at the first bend.
Slide the inner liner fully onto the takeoff collar or boot collar to the manufacturer-specified engagement length before clamping. Tighten the listed clamp or draw band to the manufacturer-specified position or torque. An under-engaged or under-tightened connection is the most common point of branch failure.
Shut down the equipment using the Project 2 procedure and verify the blower cannot start before cutting duct, connecting to a takeoff collar, or working inside a register boot. Do not perform this work with the blower operating or capable of unexpected startup.
Inspect the approved route for sharp edges, heat sources, moisture, structural restrictions, and other utilities before cutting or routing the duct. Stop work if concealed wiring, plumbing, or structural members are found in the marked route and were not identified in the approved design.
HV-055 – HV-060
Duct-Branch Installation Qualification
Quantity: one flexible-duct branch per assigned register, installed at the approved diameter and route, connected and sealed at both the takeoff collar and register boot, supported at the specified spacing, insulated per the approved system, and verified under airflow.
| Component | Quantity | Material | Finished Size | Preparation |
|---|---|---|---|---|
| Flexible duct | 1 length per branch | Listed insulated flexible duct per approved design | Approved diameter; cut to extended installed length | Extend fully before marking cut line |
| Inner-liner clamps | 2 per branch | Listed clamp or draw band per manufacturer instructions | Sized to collar diameter | Positioned at manufacturer-specified engagement point |
| Duct mastic | As required for 2 connections | Listed duct mastic compatible with liner material | Applied to specified thickness | Surface cleaned and dried before application |
| Support straps | Per approved spacing | Wide approved strap material | Sized to duct diameter without compression | Installed at specified spacing intervals |
| Joint | Fastener/Hardware | Installation Direction | Final Seating Condition |
|---|---|---|---|
| Liner-to-collar | Listed clamp or draw band per manufacturer instructions | Positioned over the manufacturer-specified engagement zone | Tightened to manufacturer-specified position or torque; no liner slip when pulled by hand |
| Liner-to-boot | Listed clamp or draw band per manufacturer instructions | Positioned over the manufacturer-specified engagement zone | Tightened to manufacturer-specified position or torque; no liner slip when pulled by hand |
| Outer jacket closure | Manufacturer-specified closure (tape, drawstring, or clamp per product) | Applied over insulation covering the sealed liner connection | Continuous closure with no gaps in vapor facing |
| Support strap | Wide approved strap fastened per manufacturer instructions | Perpendicular to duct axis at marked support points | Snug without compressing insulation; duct level or sloped per design |
Reference end: the takeoff-collar end of the branch. Reference direction: airflow travels from the takeoff collar toward the register boot. Top: the upper surface of the duct as installed, used for identifying sag. Long-radius bend: a bend whose radius does not reduce the duct's internal diameter or crease the inner liner.
| Check | Standard |
|---|---|
| Diameter and length | Match the approved design; no field substitution |
| Liner connections | Full manufacturer-specified engagement, clamped, and sealed at both ends with no visible gap |
| Jacket closure | Continuous vapor-facing closure with no gaps over each sealed connection |
| Support spacing | Matches the approved design or manufacturer maximum spacing; no unsupported span exceeds that limit |
| Sag | Does not exceed the manufacturer-specified maximum sag between supports |
| Bends | Long-radius only; no kinks, crushing, or sharp offsets |
| Airflow test | No collapse, audible leakage, excessive vibration, or register underperformance during the authorized test |
Inspect every completed flexible-duct branch using the same checks regardless of which register or route the project involves.
Complete the Flexible Duct Branch Worksheet in the Inspection Checklist section below before beginning Project 11.
Probable cause: a kinked or crushed section, an undersized bend radius, or excess installed length beyond the approved design.
Confirmation: walk the full route under operation and inspect for visible kinks, crushing, or excess sag between supports.
Correction: shut down equipment, straighten or re-support the affected section, and remove excess length if it exceeds the approved design.
Reinspection: restore equipment and repeat the register airflow verification.
Probable cause: incomplete liner engagement on the collar or boot, an under-tightened clamp, or a gap in the mastic or tape seal.
Confirmation: shut down equipment and inspect the connection visually and by hand for looseness or a visible gap.
Correction: re-engage the liner to the full manufacturer-specified depth, re-tighten the clamp, and reapply mastic or tape to close the gap.
Reinspection: restore equipment and confirm the noise no longer occurs at the corrected connection.
Probable cause: support spacing that exceeds the approved design or manufacturer maximum, or a strap that has slipped or loosened.
Confirmation: measure the sag against the manufacturer-specified maximum at the affected span.
Correction: add or reposition support straps to bring the span within the specified spacing.
Reinspection: re-measure sag at the corrected span and confirm it meets the standard.
Probable cause: a kink, a support strap installed too tightly and compressing the liner, or a bend radius smaller than the manufacturer minimum.
Confirmation: shut down equipment and inspect the affected section for compression marks, kinking, or an undersized bend.
Correction: loosen or replace the offending strap, reform the bend to the required radius, or replace the damaged section of duct.
Reinspection: restore equipment and observe the corrected section under operation for continued collapse.
Probable cause: an obstruction, utility, or dimension in the field that was not accounted for in the approved design.
Confirmation: compare the actual route and dimensions against the approved design at the specific point of disagreement.
Correction: stop work and obtain a corrected design before continuing; do not improvise a route, diameter, or length not supplied by the design.
Reinspection: resume installation only after the corrected design has been obtained and reviewed.
This project ends with the branch installed, sealed, supported, tested, and the work area restored, not left with exposed cut ends, loose material, or unsecured access panels.
| Competency | Independent Pass Standard | Not Demonstrated | With Assistance | Independently |
|---|---|---|---|---|
| HV-055 | Lays out the duct branch using the approved diameter, length, route, and support points | |||
| HV-056 | Cuts flexible duct, including the outer jacket, insulation, and inner liner, without damaging the liner | |||
| HV-057 | Connects the inner liner to the takeoff collar and register boot with the required engagement, clamp, and seal | |||
| HV-058 | Secures the outer jacket over the sealed connection using the specified closure | |||
| HV-059 | Supports the duct without sagging, using the specified strap type and spacing | |||
| HV-060 | Inspects the airflow path for collapse, leakage, excessive sag, and register delivery |
Mark one column per competency. Only Demonstrated Independently awards the competency; Demonstrated with Assistance authorizes additional supervised practice but does not complete the requirement.
| Item | Target Condition | Result | Pass/Fail | Correction (if any) |
|---|---|---|---|---|
| Diameter, length, and route | Match the approved design exactly | |||
| Liner connection — collar | Fully engaged, clamped, and sealed with no gap | |||
| Liner connection — boot | Fully engaged, clamped, and sealed with no gap | |||
| Jacket closure | Continuous vapor facing over both sealed connections | |||
| Support spacing and sag | Within approved design or manufacturer maximum | |||
| Bends | Long-radius only; no kinks, crushing, or sharp offsets | |||
| Airflow test | No collapse, leakage, excessive vibration, or underperformance |
Unresolved conditions and escalation notes: ____________________________________________
Branch declared ready: ______ (Pass/Fail) Date: ____________ Builder name: ____________
With the branch laid out, cut, connected, sealed, jacketed, supported, and tested, review the finished branch against the Acceptance Standards table and confirm the diameter, length, and route match the approved design, both liner connections are fully engaged, clamped, and sealed, the outer jacket is continuously closed over each connection, support spacing and sag are within the approved or manufacturer limit, all bends are long-radius, and the branch shows no collapse, leakage, vibration, or underperformance during the airflow test. Complete the Flexible Duct Branch Worksheet and correct any failed item before beginning Project 11. If an item fails, identify whether the error occurred in layout, cutting, liner connection, jacket closure, support installation, or the airflow test before correcting it and re-running the affected check.
You have completed the tenth project in the residential HVAC sequence: installing a flexible duct branch to a supply register. This project required you to lay out the approved branch, cut the flexible duct without damaging the inner liner, connect and seal the liner at the takeoff collar and register boot, close the outer jacket, support the duct without sagging, and inspect the completed branch under airflow (HV-055 through HV-060).
You now have a documented, sealed, and tested flexible-duct branch installation record. That record carries directly into the next project: balancing room airflow using the dampers and registers connected to branches installed under this and earlier duct-system projects.
Retain your Flexible Duct Branch Worksheet. You will reference this record before beginning the balancing procedure in Chapter 11 and the Chapter 20 capstone practice system.