Project 17
Install approved finish trim on one controlled stair section while preserving uniform rise, run, tread depth, and nosing, and while keeping the stair safe and in barricaded control throughout the work.
These cues appear at the point of work. Stair-trim work carries walking-surface and fall consequences that most other finish-carpentry work does not, so the safety and code cues in this chapter control ahead of convenience.
Task-specific safety guidance for ordinary work hazards.
Serious injury, fall, or major damage is possible.
Practical work-area safety: lighting, cords, footing, and housekeeping.
Local requirements vary. Verify permit, inspection, and jurisdictional rules on stair geometry.
Follow product-specific instructions for adhesives, fasteners, and nosing hardware.
Rise, run, tread depth, and nosing-projection guidance.
This project qualifies you to install finish trim on stair treads, risers, and nosings on one controlled stair section while preserving the rise, run, tread depth, and nosing geometry the structural stair has already been inspected and accepted with. The finished work product is a securely installed set of riser and tread finish pieces with supported nosing transitions, a documented set of final stair measurements, and a completed stair-finish safety inspection.
You will verify that the structural stair has already passed inspection, measure every tread and riser independently, inspect for movement and protruding fasteners, correct structural or fastening defects through the responsible trade before finish work begins, barricade the stair and establish safe alternate access, install riser and tread trim in the approved sequence, fit nosing or return trim while maintaining uniform projection, fasten and adhere trim without leaving proud fasteners in the walking surface, and hold the stair out of service through the required cure period.
This project depends directly on Project 16. The skirt board installed there establishes the wall-side termination that riser and tread trim in this project must fit against. This project also depends on the Chapter 1 readiness survey and on the structural stair inspection referenced throughout this chapter; neither this project nor Project 16 authorizes any change to rise, run, tread depth, nosing, guard, or handrail geometry.
Project 16 established the finish skirt board fitted to the existing tread-and-riser profile without altering stair geometry. This project installs the riser, tread, and nosing trim that completes the finished walking surface against that skirt. The final stair measurements and safety inspection produced here become the controlling stair-trim record referenced in the Chapter 20 capstone, which repeats this inspection whenever the capstone room includes an inspected stair assembly.
The stop-work and barricade discipline used in this project also controls Chapter 20 Step 21 and Step 34, which reference this chapter directly for any capstone room containing stair trim.
This project covers:
This project does not authorize the learner to:
Any tread, riser, or nosing condition that fails this project's inspection standards must be corrected, reinspected, and documented before the stair is returned to service.
Establish these references before any stair-trim measurement is recorded, and do not change them mid-flight.
| Term | Definition |
|---|---|
| Rise | The vertical distance from the top of one finished tread to the top of the next, measured after finish trim is installed |
| Run | The horizontal distance from the face of one riser to the face of the next, measured after finish trim is installed |
| Tread depth | The horizontal distance from the leading edge of the nosing to the face of the riser above, measured after finish trim is installed |
| Nosing projection | The horizontal distance the tread nosing extends beyond the face of the riser below it |
| Structural reference measurement | The rise, run, tread depth, and nosing dimension recorded from the accepted structural stair before any finish trim is installed, used as the controlling comparison for every finished step |
| Walking surface | The finished tread and nosing surface a person's foot contacts; this surface must be free of proud fasteners, trip edges, and slippery finish conditions |
Before removing the barricade or beginning any cut, record the stair identity and controlling documents directly on the stair-trim worksheet:
Stair or flight identifier: ______ Structural stair inspection reference: ______ Tread/riser/nosing detail reference: ______ Skirt board reference (Project 16): ______
Date started: ____________ Installer name: ____________
Stair-finish trim differs from every other trim category in this book in one controlling respect: the completed work is a walking surface with fall and trip consequences, not a decorative or wall-mounted assembly. Every dimension installed in this chapter is checked against the structural reference measurement recorded before finish work began, not against the adjacent finished step or the learner's visual judgment. The stair remains barricaded and out of service from the start of Section E through the completion of the cure period in Section K.
Do not assume every tread and riser in a flight matches the drawn dimension exactly. Measure and record the rise, run, and tread depth of every individual step against the structural reference before cutting any finish piece, and cut each riser and tread to its own measured step rather than to one averaged dimension for the flight.
Barricade the stair and establish safe alternate access before removing any tread or riser covering, before dry-fitting any piece, and before beginning any cut, fastening, or adhesive step described in this chapter. Do not allow foot traffic on the stair while trim is loose, adhesive is curing, or fasteners have not been fully set. Keep the barricade in place through the required cure period specified in Section K.
This project may not alter rise, run, tread depth, nosing projection, guard, or handrail geometry established by the accepted structural stair. Verify local code requirements for maximum rise and run variation within a flight before beginning finish installation, and confirm that the finished nosing projection matches the value in the approved tread, riser, and nosing detail.
Measure and record the nosing projection at every tread against the structural reference measurement. A nosing that projects more or less than the adjacent steps by more than the tolerance stated in the approved detail is a trip hazard even where each individual tread depth otherwise passes inspection.
Apply adhesive at the coverage rate stated in the manufacturer's instructions for the tread, riser, or nosing product being installed, and hold the stair out of service for the full cure period stated by the manufacturer before foot traffic resumes.
FC-097 – FC-102
Stair Finish-Trim Installation Qualification
Quantity: one completed set of riser, tread, and nosing finish trim for the approved stair section, consisting of one riser piece and one tread piece per step, nosing or return trim at every exposed tread edge, a final stair-measurement record, and a completed stair-finish safety inspection.
| Component | Quantity | Material | Finished Size | Preparation |
|---|---|---|---|---|
| Riser trim | 1 per riser | Per approved riser detail | Fit to the measured width between skirts or walls at that specific riser | Square-cut ends, dry-fit before fastening |
| Tread trim | 1 per tread | Per approved tread detail | Fit to the measured tread depth and width without reducing required tread depth | Square-cut ends, dry-fit before fastening |
| Nosing or return trim | 1 per exposed tread edge | Per approved nosing detail | Uniform projection matching the structural reference measurement | Profile-matched, coped or mitered return as specified |
List every riser, tread, and nosing piece on the stair-trim worksheet by step number. Do not record the flight as a single averaged quantity.
Use the fastener type, size, spacing, and installation direction stated in the approved stair-finish specification for each of the following joints: riser-to-stringer or riser-to-skirt, tread-to-stringer or tread-to-subtread, and nosing-to-tread. Set every fastener below the walking surface without crushing the profile. Do not use a fastener not identified in the approved schedule.
| Check | Standard |
|---|---|
| Rise consistency | Each finished rise matches the structural reference measurement within the tolerance stated in the approved detail or adopted code |
| Run consistency | Each finished run matches the structural reference measurement within the tolerance stated in the approved detail or adopted code |
| Tread depth | Each finished tread depth meets or exceeds the structural reference measurement; finish trim does not reduce required tread depth |
| Nosing projection | Uniform projection at every tread, matching the structural reference measurement within the tolerance stated in the approved detail |
| Fastener condition | No exposed or proud fastener heads in the walking surface at any tread or nosing |
| Movement | No tread, riser, or nosing movement, squeak, or deflection under normal walking load after cure |
| Cure compliance | Stair held out of service for the full manufacturer-specified cure period before final inspection |
Apply the following checks to every riser, tread, and nosing piece before it is fastened or adhered permanently.
Complete the Stair-Finish Safety Worksheet in the Inspection Checklist section below before removing the barricade and returning the stair to service.
Probable cause: the tread trim or nosing was cut using an averaged flight dimension rather than the measurement recorded for that specific step, or the riser trim above was installed proud of its reference line.
Confirmation: re-measure the finished tread depth at that step and compare it to the recorded structural reference measurement.
Correction: remove and recut the tread or nosing piece, or correct the riser installation, so the finished tread depth meets or exceeds the structural reference measurement.
Reinspection: repeat the tread-depth measurement at the corrected step and at the two adjacent steps.
Probable cause: nosing pieces were fit to the adjacent installed tread by eye instead of to the structural reference measurement for each step.
Confirmation: measure nosing projection at every tread in the flight and compare each to the structural reference measurement.
Correction: remove and refit the out-of-tolerance nosing piece to match the structural reference measurement.
Reinspection: repeat the nosing-projection measurement across the full flight.
Probable cause: inadequate adhesive coverage, a missed fastener location, or an unresolved structural defect that was not corrected before finish installation.
Confirmation: walk the affected tread under load and inspect the underside and fastening pattern where accessible.
Correction: refer an unresolved structural cause to the responsible trade; otherwise remove and reinstall the tread with the specified adhesive coverage and fastener pattern.
Reinspection: repeat the load check and confirm no deflection or squeak remains.
Probable cause: the fastener was not set below the surface, or was driven at an angle that raised the head on one side.
Confirmation: run a hand across the surface and inspect under raking light for a raised head.
Correction: set the fastener flush below the surface without crushing the profile, or remove and replace it with a properly seated fastener.
Reinspection: repeat the hand and raking-light check across the full tread and nosing.
Probable cause: the barricade was removed based on the fastening schedule alone without confirming the manufacturer's adhesive cure period.
Confirmation: compare the installation date and time against the manufacturer's stated cure period for the adhesive used.
Correction: reinstall the barricade immediately and hold the stair out of service until the full cure period has elapsed.
Reinspection: repeat the movement and load check at every tread before removing the barricade again.
This project does not end until the required cure period has elapsed and the final safety inspection is complete.
| Competency | Independent Pass Standard | Not Demonstrated | With Assistance | Independently |
|---|---|---|---|---|
| FC-097 | Inspects every tread and riser for movement, damage, protruding fasteners, and moisture before finish trim is installed, and refers defects for correction | |||
| FC-098 | Cuts and installs riser trim fitted to skirts or walls in the approved installation sequence with height relationships verified at each step | |||
| FC-099 | Installs tread trim meeting or exceeding the structural reference tread depth at every step | |||
| FC-100 | Fits nosing or return trim to the specified profile and support with uniform projection across the flight | |||
| FC-101 | Secures every riser, tread, and nosing piece with adhesive and fasteners set flush, with no proud or exposed heads in the walking surface | |||
| FC-102 | Inspects the completed stair for trip, movement, projection, and geometry hazards and documents a passing safety inspection before service resumes |
Mark one column per competency. Only Demonstrated Independently awards the competency; Demonstrated with Assistance authorizes additional supervised practice but does not complete the requirement.
| Item | Inspected (Y/N) | Defect Found (Y/N) | Deficiency Recorded (Y/N) | Reinspected (Y/N) | Correction |
|---|---|---|---|---|---|
| Structural stair acceptance confirmed | |||||
| Rise at every step | |||||
| Run at every step | |||||
| Tread depth at every step | |||||
| Nosing projection uniformity | |||||
| Riser installation and fit | |||||
| Fastener condition (proud/exposed) | |||||
| Movement or squeak under load | |||||
| Top landing transition | |||||
| Bottom floor transition | |||||
| Cure period completed |
Total open deficiencies: ____________ Total closed deficiencies: ____________
Cure period start: ____________ Cure period complete: ____________ Stair returned to service (Y/N): ______ Date: ____________ Inspector name: ____________
With the stair-trim installation complete, review every step against the Acceptance Standards table and confirm every rise, run, and tread depth was measured and recorded against the structural reference, nosing projection is uniform across the flight within the stated tolerance, no fastener is proud or exposed in the walking surface, no tread or riser shows movement or squeak under load, the top landing and bottom floor transitions are free of trip conditions, and the stair has been held out of service through the full cure period. Complete the Stair-Finish Safety Worksheet and issue the final documented result before removing the barricade. If any item cannot be closed, keep the barricade in place, record the item as an open condition, and identify the trade or professional responsible for correction before the stair is returned to service.
You have completed the seventeenth project in the interior finish carpentry sequence: installing stair tread, riser, and nosing trim. This project required you to inspect stair surfaces for movement, damage, protruding fasteners, and moisture before finish trim was installed (FC-097), cut riser trim to fit between skirts or walls in the approved sequence (FC-098), install tread trim without reducing required tread depth (FC-099), fit nosing transitions with uniform projection using the specified profile and support (FC-100), secure stair trim with adhesive and fasteners that leave no exposed or proud heads in the walking surface (FC-101), and inspect the completed stair-finish work for trip, movement, projection, and geometry hazards (FC-102).
You now have a securely installed stair-finish assembly with documented final measurements and a completed safety inspection. That record carries forward into the next project, where fastener setting, filling, caulking, and sanding are completed on the paint-grade trim installed throughout this book.
Store the completed stair-trim project record, including all final measurements and the safety inspection, where it will be available for the Chapter 20 capstone. Do not remove the barricade or return the stair to unrestricted service until the cure period has elapsed and the safety inspection is signed.