Inspect one residential landscape area for sun, drainage, soil, utilities, and access conditions, and produce a documented planting, soil, drainage, irrigation, access, and maintenance-readiness plan that controls every later project in this book.
These cues appear at the point of work. They identify safety, code, manufacturer, and measurement issues before they become drainage failures, plant loss, or unsafe conditions.
Task-specific safety guidance for ordinary inspection hazards.
Serious injury, utility strike, or major property damage is possible.
Practical work-area safety: footing, weather, insects, and site hazards.
Local requirements vary. Verify permit, zoning, and jurisdictional rules.
Follow product- or instrument-specific instructions for tools and test kits.
Reference point, area, and pattern-recording guidance.
This chapter qualifies you to inspect a residential landscape area and produce one documented readiness plan covering climate exposure, drainage, soil, existing plants, utilities, irrigation, access, hazards, and prerequisites. The finished work product is a completed Landscape Readiness Worksheet, a deficiency and prerequisite list, and an issued project decision: approved, conditional, or rejected.
You will gather the plans and records that control the project, define the project area and goals, verify boundaries and restricted zones, request utility locating, inspect buildings and existing conditions, record sun and shade patterns, assess microclimate exposure, inspect grade and drainage, measure the landscape area, inspect soil, evaluate existing plants, assess irrigation and access, and issue a documented readiness decision.
This is the first chapter in the book. Every later chapter — soil amendment, vegetation removal, grading, bed edging, planting, turf work, irrigation, drainage, pruning, fertilizing, restoration, and the Chapter 20 capstone — begins from the readiness plan produced here. No later chapter authorizes work in an area that has not passed this inspection or had its deficiencies corrected and reinspected.
This chapter is the entry point for the entire book. The Landscape Readiness Worksheet you complete here becomes the controlling reference for soil testing and amendment in Chapter 3, vegetation removal in Chapter 4, grading in Chapter 5, bed layout in Chapter 6, every planting chapter from Chapter 8 through Chapter 10, turf work in Chapters 11 through 13, irrigation and drainage in Chapters 14 through 16, ongoing maintenance in Chapters 17 and 18, restoration in Chapter 19, and the complete capstone project in Chapter 20.
The sun-and-shade record, drainage findings, soil observations, and measured areas produced in this chapter are not preliminary notes to be discarded. They are the reference data every later chapter is required to use rather than re-derive or assume.
This chapter covers:
This chapter does not authorize the learner to:
Any area that fails this inspection must be corrected, or referred to the required qualified professional, and reinspected under this chapter before any later chapter's work begins.
Establish these references before the inspection begins, and do not change them mid-inspection.
| Term | Definition |
|---|---|
| Project area | The specific landscape area defined in Step 2, measured and inspected in this chapter; not the entire property unless the site plan defines the entire property as the project area |
| Reference boundary | The verified property line, easement line, or setback line the project area is measured against |
| Low point | The lowest observed grade elevation within the project area where runoff or ponding collects |
| Foundation-water risk zone | Any area within the specified clearance of a foundation, siding, or building opening where water is observed or likely to collect |
| Microclimate condition | A localized exposure such as a heat-reflective wall, wind corridor, frost pocket, salt exposure, or sheltered pocket that differs from the general site exposure |
| Deficiency | Any condition identified in this chapter that must be corrected, or referred to a required qualified professional, before an approved readiness decision can be issued |
Before beginning the inspection, record the project identification directly on the Landscape Readiness Worksheet:
Property address: ______________________ Project area description: ______________________
Date started: ____________ Inspector name: ____________ Reference boundary source: ______ (Survey / Plat / Site plan / Staked by owner)
Every project in this book depends on the site data gathered here. This chapter teaches four fundamentals that later chapters treat as already established: verified boundaries and utilities, a recorded sun-and-shade pattern, a recorded drainage pattern, and a documented soil and plant condition.
Verify property lines, easements, setbacks, right-of-way, septic areas, wells, and prohibited work zones before defining the final project area. Request utility locating before any digging, trenching, auguring, driving stakes, installing edging, or planting trees and shrubs authorized by a later chapter. Stop work for unidentified utilities, unstable slopes, contaminated soil, buried tanks, sewage, major erosion, foundation conflicts, groundwater, hazardous materials, or unknown drainage outlets.
Record which parts of the project area receive direct sun, partial shade, and full shade, and note the time of day and, where the inspection schedule allows, the season. A single observation does not capture how a building, fence, or mature tree changes the pattern across the day.
Do not drive stakes, probe soil below the surface at more than a shallow depth, or authorize any later digging, trenching, or planting until the utility-locating service has marked the project area and those marks have been confirmed valid. Contact with an unmarked utility line can cause serious injury, fire, explosion, or service disruption.
Watch footing on slopes, uneven turf, hidden holes, tripping hazards, and wet or icy surfaces while walking the project area. Wear sun, insect, and weather protection appropriate to the season, and stop the inspection during lightning, extreme heat, or other hazardous weather.
Confirm adopted zoning, stormwater, irrigation, backflow, environmental, and water-use requirements for the jurisdiction before finalizing the project scope. These requirements vary by location and must be verified rather than assumed.
LS-001 – LS-006
Site Inspection / Planning Qualification
Deliverable: one documented landscape project plan for one defined project area, identifying climate exposure, drainage, soil, utilities, plant constraints, irrigation, access, hazards, and prerequisites, and concluding with an issued approved, conditional, or rejected readiness decision.
| Section | Required Content | Source Steps |
|---|---|---|
| Project Definition | Project area, intended use, maintenance level, budget, and establishment period | Steps 1–2 |
| Boundaries and Utilities | Property lines, easements, setbacks, right-of-way, septic areas, wells, prohibited zones, and utility-locating results | Steps 3–4 |
| Existing Conditions | Buildings, foundations, siding, windows, doors, hardscape, fences, utilities, irrigation, drains, and existing plants | Step 5 |
| Sun, Shade, and Microclimate | Sun and shade by time of day and season; heat-reflective walls, wind exposure, frost pockets, salt exposure, sheltered microclimates | Steps 6–7 |
| Grade and Drainage | Existing grade and drainage, runoff sources, ponding, erosion, roof discharge, low points, and foundation-water risks | Steps 8–9 |
| Measured Areas | Planting beds, lawn areas, slopes, paths, access routes, and grade changes | Step 10 |
| Soil Condition | Texture, compaction, color, odor, drainage, organic matter, roots, debris, and prior disturbance | Step 11 |
| Existing Plants | Desirable, invasive, diseased, hazardous, or overgrown status; mature-size conflicts with buildings, utilities, hardscape, sight lines, and drainage | Steps 12–13 |
| Irrigation and Access | Irrigation source, pressure, backflow protection, controller, hose access, watering restrictions, and equipment and material access | Steps 14–15 |
| Stop-Work Review | Unidentified utilities, unstable slopes, contaminated soil, major tree hazards, disputed boundaries, or unlawful drainage | Step 16 |
| Strategy and Deficiencies | Preliminary plant, soil, irrigation, drainage, and maintenance strategy; deficiency and prerequisite list | Steps 17–18 |
| Final Decision | Reinspection of corrected conditions and the issued readiness decision | Steps 19–20 |
| Check | Standard |
|---|---|
| Section completeness | All twelve sections of the Readiness Plan Section Schedule are completed with the required content |
| Boundary and utility verification | Property lines, easements, setbacks, and utility locating are confirmed before any deficiency is cleared |
| Sun and shade record | Recorded for more than one time of day where the inspection schedule allows, with microclimate conditions identified |
| Drainage record | Every observed low point, runoff source, and foundation-water risk is identified and located on the plan |
| Measured areas | Every measured area, slope, path, and access route is recorded with its dimension |
| Deficiency resolution | Every listed deficiency is corrected, referred to the required qualified professional, or documented as a condition of a conditional decision |
| Final decision | One of approved, conditional, or rejected is issued and signed with a date |
Review every completed Landscape Readiness Worksheet using the same checks regardless of the project area's size or intended use.
Complete the Inspection Checklist in the section below before beginning Chapter 2.
Probable cause: the sun-and-shade observation was recorded at only one time of day, missing shade cast later by a building, fence, or mature tree.
Confirmation: revisit the project area at a different time of day and compare the new observation to the recorded pattern.
Correction: update the Landscape Readiness Worksheet with observations from at least two additional times of day before finalizing the strategy.
Reinspection: repeat the sun, shade, and drainage check for the corrected sections.
Probable cause: the grade and drainage inspection was performed during dry conditions without a controlled water observation, or a low point was not walked directly.
Confirmation: reinspect the area during or immediately after rainfall, or conduct a controlled water observation where permitted.
Correction: record the newly identified low point, runoff source, or foundation-water risk, add it to the deficiency list, and reissue the readiness decision as conditional until corrected.
Reinspection: repeat the boundary and utility check and the drainage check after correction.
Probable cause: the deficiency list did not clearly flag utility locating as a prerequisite, or markings were assumed valid without visual confirmation.
Confirmation: inspect the project area for current utility-locating marks and confirm the request date against the marking's stated valid period.
Correction: stop any later digging, trenching, or planting immediately, request new utility locating, and confirm markings before resuming.
Reinspection: repeat the boundary and utility check before reissuing the readiness decision.
Probable cause: a bed, lawn area, slope, or access route was measured informally by eye rather than with a tape measure or measuring wheel, or a grade change was not recorded.
Confirmation: remeasure the affected area using a tape measure or measuring wheel and compare the new figure to the recorded dimension.
Correction: update the measured-areas section of the Landscape Readiness Worksheet with the corrected dimension.
Reinspection: repeat the measurement check on the corrected section.
Probable cause: a deficiency was identified but not corrected, referred, or documented as a condition before the decision was signed.
Confirmation: compare the deficiency list against the signed decision and identify any item without a documented resolution.
Correction: reopen the decision, resolve or document each outstanding deficiency, and reissue the decision only after reinspection.
Reinspection: repeat the deficiency check and the decision check before proceeding to Chapter 2.
Probable cause: the existing-plant assessment recorded current size and condition but did not consider mature size against nearby buildings, utilities, hardscape, sight lines, or drainage.
Confirmation: research the mature size of the identified species and compare it against the measured distance to the nearest fixed feature.
Correction: add the conflict to the deficiency list and note whether the plant requires removal, relocation, or ongoing pruning management in a later chapter.
Reinspection: repeat the existing-plants section review before finalizing the strategy.
This chapter ends with a completed, signed worksheet retained for use by every later chapter, not filed away unused.
| Competency | Independent Pass Standard | Not Demonstrated | With Assistance | Independently |
|---|---|---|---|---|
| LS-001 | Inspects buildings, hardscape, utilities, irrigation, drains, and existing plants and records their condition and location on the worksheet | |||
| LS-002 | Records sun and shade patterns by time of day and season where possible, and identifies applicable microclimate conditions | |||
| LS-003 | Identifies runoff sources, ponding, erosion, roof discharge, low points, and foundation-water risks across the full project area | |||
| LS-004 | Evaluates soil texture, compaction, color, odor, drainage, organic matter, roots, debris, and disturbance using field indicators | |||
| LS-005 | Measures and records planting beds, lawn areas, slopes, paths, access routes, and grade changes accurately | |||
| LS-006 | Prepares a complete deficiency and prerequisite list, reinspects corrected conditions, and issues a signed, dated readiness decision |
Mark one column per competency. Only Demonstrated Independently awards the competency; Demonstrated with Assistance authorizes additional supervised practice but does not complete the requirement.
| Section | Completed (Y/N) | Deficiencies Found | Resolution |
|---|---|---|---|
| Project Definition | |||
| Boundaries and Utilities | |||
| Existing Conditions | |||
| Sun, Shade, and Microclimate | |||
| Grade and Drainage | |||
| Measured Areas | |||
| Soil Condition | |||
| Existing Plants | |||
| Irrigation and Access | |||
| Stop-Work Review | |||
| Strategy and Deficiencies | |||
| Final Decision |
Readiness decision declared: ______ (Approved / Conditional / Rejected) Date: ____________ Inspector name: ____________
With all twelve sections of the Landscape Readiness Worksheet completed, review the finished plan against the Acceptance Standards table and confirm every section contains the required content, boundaries and utility locating are verified, sun and shade patterns and drainage findings are recorded with location, every measured area is recorded with its dimension, every deficiency is corrected, referred, or documented as a condition, and one final readiness decision is issued, signed, and dated. If any deficiency remains unresolved, correct or refer it and repeat the affected section review before issuing the final decision.
You have completed the first chapter in the landscaping project sequence: inspecting and planning a residential landscape project. This chapter required you to inspect site conditions (LS-001), identify sun and shade patterns (LS-002), identify drainage issues (LS-003), evaluate soil condition (LS-004), measure landscape areas (LS-005), and document project readiness (LS-006).
You now have a documented landscape project plan that identifies climate exposure, drainage, soil, utilities, plant constraints, irrigation, access, hazards, and prerequisites. That plan carries directly into the next chapter: setting up a controlled landscaping work area and material staging plan built on the exact conditions and constraints recorded here.
Store your completed Landscape Readiness Worksheet, deficiency list, and photographic record where every later chapter can reference them. Chapter 2 begins from the project area and conditions documented in this chapter.