Project 02
Prepare, cut, and set the approved floor girders or beams on their specified bearing points, posts, pockets, or connectors, and verify that the completed beam system carries a continuous, inspected load path from the foundation upward.
These cues appear at the point of work. They identify safety, code, manufacturer, and measurement issues before they become rework, disputes, or hazards.
Task-specific safety guidance for ordinary work hazards.
Serious injury or major structural consequence is possible.
Practical work-area safety: footing, debris, standing water, and access.
Local requirements vary. Verify permit, inspection, and jurisdictional rules.
Follow product-specific instructions for engineered beams and connectors.
Clearance, layout, spacing, and reference-point guidance.
This project qualifies you to prepare and install the approved floor girders or beams that carry the floor-joist system down through posts, pockets, or piers to the foundation. The finished work product is a set of beams identified, cut, seated, connected, and verified against the approved beam schedule, with a completed beam-installation record.
You will review the beam plan and connector schedule, confirm that bearing surfaces have passed inspection, inspect and reject unsuitable beam stock, cut solid-sawn members only where the plan permits field cutting, lift and seat each beam section on its specified bearing points, install the specified post caps, straps, and connectors, and verify elevation, level, line, splice position, and load path before the beam system is loaded.
This project follows the reference lines and readiness record established in Project 01 and sits immediately before the floor joists in Project 03. Every joist placed in Project 03 bears directly on the beams installed here, so an error in beam elevation, bearing, or connection carries forward into the entire floor system.
The beam system installed in this project is the load path every floor joist in Project 03 depends on, and it is the first structural member-sizing decision in this book that must come directly from the approved beam schedule rather than field judgment. The bearing, splice, and connector discipline taught here — full seating at every support, splices only over approved bearing, and listed fasteners for listed connectors — repeats at every later beam, header, and ridge installation in this book.
The temporary-restraint and controlled-lift procedures introduced here are the same procedures expanded in Chapter 11 for wall raising and in Chapter 15 for truss setting.
This project covers:
This project does not authorize the learner to:
Any beam material that arrives damaged, delaminated, incorrectly identified, or excessively warped must be quarantined and referred, not installed with a field-improvised correction.
Establish these references before any beam is marked, cut, or lifted.
| Term | Definition |
|---|---|
| Bearing point | A foundation ledge, pocket, pier, post cap, or other support surface where a beam section is required to seat, as identified on the approved beam plan |
| Reference end | The beam end identified on the approved plan or schedule from which cut-line measurements are taken |
| Full bearing | Contact between the beam and its support surface across the minimum bearing length stated on the approved plan or connector documentation, with no gap |
| Splice | A joint between two beam sections, permitted only directly over a bearing point identified on the approved plan and only in the orientation specified there |
| Temporary restraint | Bracing, shoring, or strapping installed immediately after a beam is seated and before lifting equipment is released, to prevent displacement or rotation |
| Load path | The continuous connection from beam to post, pier, or foundation that transfers floor loads downward without an unsupported gap |
Before cutting any beam material, record the controlling documents and beam schedule reference directly on the beam-installation record:
Beam plan set and revision date: ______ Beam schedule reference: ______ Connector schedule reference: ______
Date started: ____________ Builder name: ____________
Every beam installed in this project is placed, seated, and connected using the same sequence: verify bearing readiness, inspect and stage material, measure before cutting, lift and seat under controlled restraint, connect to the approved schedule, and verify the completed load path. Applying that sequence consistently, section by section, is what keeps a multi-section beam run level and in line.
A beam section that is level and correctly cut but seated with less than the specified minimum bearing length at one end does not meet this project's acceptance standard, even though it may appear stable. Splices are permitted only directly over an approved bearing point; a splice located between supports is a different structural condition than the approved design and must not be created in the field to use shorter stock or avoid a difficult lift.
Measure the actual bearing-to-bearing dimension in the field before cutting any beam section, and compare it with the plan dimension from Step 7 of the procedure below. Do not cut a beam to the plan dimension alone if the field measurement differs; log the difference and confirm the correct length before cutting.
Lift and place each beam section using the approved worker count, rigging method, and access controls identified in the beam plan. Install temporary restraint immediately after the beam is seated and before any worker releases the lifting equipment or steps away. Do not work beneath a beam that is supported only by lifting equipment or unsecured temporary props.
Do not cut, drill, notch, or otherwise alter an engineered wood beam except as explicitly permitted by the manufacturer's published instructions for that product. Seal treated or engineered-member cut ends when the manufacturer's instructions require it, using the specified sealant.
Minimum bearing length, connector requirements, and permitted field-cutting practices vary by jurisdiction, product listing, and the approved design. Verify the current beam schedule and connector schedule with the responsible design professional or authority having jurisdiction before treating any bearing or connection as complete.
FR-007 – FR-012
Structural Installation Qualification
Scope: one completed installation of every floor girder or beam section shown on the approved beam plan for the current structure, including all specified bearing supports, splices, and connectors, with a completed beam-installation record.
| Document | Source | Confirmation Required |
|---|---|---|
| Beam plan and schedule | Design professional / plan set | Current revision on site; beam size, species/grade or product designation, and span match the schedule |
| Bearing and connector schedule | Design professional / manufacturer | Post caps, hangers, straps, bolts, and structural screws match the specified type, size, and quantity |
| Bearing inspection approvals | Authority having jurisdiction | Foundation, sill-plate, post, pier, and pocket inspections required for beam bearing are confirmed complete |
| Manufacturer instructions for engineered members | Manufacturer | Field-cutting, hole, notch, and end-sealing restrictions confirmed before handling |
| Lift plan | Project supervisor | Worker count, rigging method, and access controls confirmed for each beam section |
| Component | Quantity | Material | Finished Size | Preparation |
|---|---|---|---|---|
| Beam sections | Per approved beam schedule | Per approved beam schedule (solid-sawn, engineered, or as specified) | Bearing-to-bearing length per field measurement, Step 7 | Cut only where the plan permits field cutting; seal cut ends per manufacturer instructions where required |
| Post caps / bearing plates | Per approved connector schedule | Per approved connector schedule | As supplied | Installed at each post or pier bearing point per Step 11 |
| Hangers, straps, bolts, structural screws | Per approved connector schedule | Per approved connector schedule | As supplied | Installed per the fastening pattern in Step 18 |
| Shims | As required by field bearing conditions | Per approved detail or manufacturer instructions | As required to achieve full, level bearing | Installed only at bearing points identified in Step 11 |
| Check | Standard |
|---|---|
| Bearing length | Full contact across the minimum bearing length stated on the approved plan or connector documentation at every support, with no gap |
| Elevation | Beam top matches the plan elevation within the tolerance stated on the approved plan; if none is stated, obtain the tolerance from the design professional |
| Level | Beam is level along its length and across all bearing points as measured with a 4-foot level or longer straightedge |
| Splice location | Every splice occurs directly over an approved bearing point and in the orientation specified on the plan |
| Connector installation | Every post cap, hanger, strap, bolt, and structural screw matches the approved connector schedule for type, size, quantity, and installation direction, with listed fasteners only |
| Documentation completeness | Beam identification, dimensions, elevations, connections, field cuts, and inspection results are recorded on the beam-installation record |
Inspect the completed beam system using the same checks regardless of which section it covers.
Complete the Beam-Installation Record in the Inspection Checklist section below before beginning Project 03.
Probable cause: an uneven bearing surface, a missing or incorrect shim, or a post cap installed at the wrong elevation.
Confirmation: check level at each bearing point individually rather than only at midspan, and measure each bearing surface's elevation against the plan.
Correction: install or adjust shims specified for that bearing condition at the low point; do not correct an elevation error by trimming the beam.
Reinspection: repeat the level check across the full beam length and at every bearing point after shimming.
Probable cause: the beam was cut to an incorrect length, the bearing point was built at the wrong location, or the beam shifted during placement.
Confirmation: measure actual bearing length at the affected end and compare it with the minimum stated on the approved plan or connector documentation.
Correction: reposition the beam if shifting caused the shortfall; if the bearing point or beam length is genuinely incorrect, log the discrepancy and obtain direction from the design professional before loading that section.
Reinspection: repeat the bearing-length check at the corrected location before proceeding.
Probable cause: beam sections were ordered or cut to lengths that do not match the plan's bearing spacing, or a section was installed out of sequence.
Confirmation: compare the as-built splice location against the bearing points marked on the approved plan.
Correction: do not fasten a splice that falls between supports; obtain a corrected member length or a design decision before completing that section.
Reinspection: repeat the splice-location check once the corrected member or design decision is installed.
Probable cause: an incorrect connector model was staged, or a generic fastener was substituted for a connector's listed fastener.
Confirmation: compare the installed connector and fastener against the approved connector schedule for model, size, and fastener type.
Correction: remove and replace the incorrect connector or fastener with the specified item; do not leave a substituted fastener in place with the reasoning that it appears equivalent.
Reinspection: repeat the connector check after the correct connector and fastener are installed.
Probable cause: damage, delamination, or excessive warp was not identified during initial delivery inspection.
Confirmation: re-inspect the remaining staged material using the same criteria applied in Step 4, and confirm the extent of the affected material.
Correction: quarantine the rejected material, log the quantity and condition, and obtain replacement material matching the approved beam schedule before continuing that section's installation.
Reinspection: repeat the material-verification step on replacement material before it is staged for lifting.
This project ends with an installed, connected, and documented beam system, protected from loading until the floor joists in Project 03 are ready.
| Competency | Independent Pass Standard | Not Demonstrated | With Assistance | Independently |
|---|---|---|---|---|
| FR-007 | Correctly identifies beam locations, orientation, and bearing points from the approved beam plan and schedule | |||
| FR-008 | Cuts beam members to the approved length and end condition using the method permitted for the specified material | |||
| FR-009 | Sets beams on their specified bearing points using the approved lifting and temporary-restraint method without damage or displacement | |||
| FR-010 | Supports and verifies bearing points, including post caps, bearing plates, and shims, matching the approved design | |||
| FR-011 | Fastens beam connections completely and correctly using the approved connector and fastener schedule | |||
| FR-012 | Inspects beam alignment, elevation, level, line, splice position, and connector seating and correctly resolves or refers every deficiency |
Mark one column per competency. Only Demonstrated Independently awards the competency; Demonstrated with Assistance authorizes additional supervised practice but does not complete the requirement.
| Check | Plan Value / Requirement | Field Value | Within Tolerance (Y/N) | Correction (if any) |
|---|---|---|---|---|
| Bearing inspection confirmation | Complete before beam loading | |||
| Beam material verification | Matches approved beam schedule | |||
| Beam length (each section) | ||||
| Bearing length (each support) | Minimum per plan/connector documentation | |||
| Elevation (each bearing point) | ||||
| Level (full length) | ||||
| Splice location(s) | Over approved bearing only | |||
| Connector installation | Matches connector schedule | |||
| Load path continuity | No unsupported gap |
Open discrepancies attached: ____________ Responsible authority for each: ____________
Beam installation approved for loading: ______ (Pass/Fail) Date: ____________ Builder name: ____________
With document review, material verification, cutting, bearing preparation, lifting, connection, and correction complete, review the finished beam system against the Acceptance Standards table and confirm bearing length, elevation, level, splice position, and connector installation all match the approved schedule, and that the beam-to-sill, beam-to-post, and beam-to-foundation load path is continuous with no unsupported gap. Complete and sign the beam-installation record before floor joists are installed in Project 03. If a discrepancy remains open, identify the responsible authority and required decision before proceeding.
You have completed the second project in the residential framing sequence: installing floor girders and beams. This project required you to identify beam locations and bearing points from the approved plan (FR-007), cut beam members to the approved length and end condition (FR-008), set beams on their specified bearing points using controlled lifting and temporary restraint (FR-009), support and verify bearing points including post caps and shims (FR-010), fasten beam connections to the approved schedule (FR-011), and inspect beam alignment, elevation, level, splice position, and connector seating (FR-012).
You now have an installed, connected, and documented beam system carrying a verified load path from the foundation upward. That beam system is the bearing surface for every floor joist installed in the next project.
Protect the installed beam system and its temporary restraint. Do not apply floor-joist or other loading until Project 03 confirms the system is ready.