Project 14
Lay out, cut, and set a matched set of site-built common rafters and a ridge board on an approved gable-roof structure, using the supplied roof plan, calculated rafter geometry, and a controlled pattern-rafter method to produce a stable, aligned roof frame.
These cues appear at the point of work. They identify safety, code, manufacturer, and measurement issues before they become rework, disputes, or hazards.
Task-specific safety guidance for ordinary work hazards.
Serious injury or major structural consequence is possible.
Practical work-area safety: footing, debris, standing water, and access.
Local requirements vary. Verify permit, inspection, and jurisdictional rules.
Follow product-specific instructions for anchors, hold-downs, and connectors.
Clearance, layout, spacing, and reference-point guidance.
This project qualifies you to frame one approved simple gable roof using site-built common rafters and a ridge board. The finished work product is a complete, plumb, aligned rafter system — ridge board set at the calculated elevation, matched pattern-cut common rafters installed at the approved spacing, and all specified ties, blocking, outlookers, and gable framing in place — ready for roof sheathing in Project 16.
You will obtain the approved roof plan and its span, run, pitch, ridge height, overhang, rafter size, spacing, and connector data; lay out the roof centerline and eave lines; calculate or obtain the common-rafter length using the approved method and supplied project data; lay out, cut, and test-fit one pattern rafter; correct the pattern before duplicating it; set the ridge board and the first rafter pairs; install remaining rafter pairs at the approved spacing; and complete every specified tie, brace, and connector before signing off the roof-geometry inspection.
This project follows Project 13, Frame Ceiling Joists, which must be complete, inspected, and released before roof framing begins. It uses the completed exterior wall system from Chapters 7 through 12 as its bearing surface, and it produces the roof frame that Project 16, Install Roof Sheathing, will deck.
The rafter system framed here carries every later roof component. Roof sheathing in Project 16 is fastened directly to these rafters, and any error in ridge height, rafter spacing, or seat-cut depth here becomes a sheathing, ventilation, or fascia problem later. The pattern-rafter method taught in this project — lay out one rafter, verify it at the actual roof before cutting the rest — is the controlling method for every site-built rafter application in this book and protects the entire roof from a single layout mistake being repeated across every rafter.
This is one of two roof-framing methods presented in this book. Project 15 frames the same category of roof using prefabricated trusses. The two methods are not combined on the same roof unless an engineered transition detail specifically permits it, and this project must not be treated as interchangeable with truss installation.
This project covers:
This project does not authorize the learner to:
Any wall-top condition, span, or plan discrepancy discovered during layout must stop rafter cutting in the affected area until direction is obtained from the responsible design professional.
Establish these references before any rafter layout begins, and do not change them once cutting has started.
| Term | Definition |
|---|---|
| Run | The horizontal distance from the outside wall plate to the roof centerline, used to calculate rafter length |
| Rise | The vertical distance from the top of the wall plate to the ridge, determined by the run and the approved pitch |
| Pitch | The roof slope expressed as inches of rise per 12 inches of run, as stated on the approved roof plan |
| Ridge plumb cut | The vertical cut at the upper end of the rafter that bears against the ridge board |
| Birdsmouth seat cut | The notch cut into the underside of the rafter consisting of a level seat cut and a plumb heel cut, providing bearing on the wall plate |
| Tail cut | The cut at the lower end of the rafter beyond the birdsmouth that forms the overhang |
| Pattern rafter | The single rafter laid out, cut, and verified first, used as the tracing master for all matching rafters |
| Roof centerline | The reference line marking the plan location of the ridge board along the length of the structure |
Before laying out the pattern rafter, record the controlling plan data directly on the project record:
Structure ID: ______ Plan set and revision date: ______ Span: ______ Run: ______ Pitch: ______ Ridge elevation: ______
Rafter size and species/grade: ______ Rafter spacing: ______ Overhang: ______ Birdsmouth depth limit: ______
Date started: ____________ Builder name: ____________
Every site-built rafter framed in this project follows the same sequence: establish the roof centerline and eave lines, calculate the rafter run and length from the approved plan data, lay out and verify one pattern rafter, duplicate the pattern, set the ridge and first rafter pairs, install remaining pairs and specified restraint, and inspect the finished roof geometry. Verifying the pattern before duplicating it protects the entire roof from a single layout error being repeated across every rafter.
The common-rafter length is derived from the run and the pitch stated on the approved roof plan, using the framing-square or rafter-calculator method supplied by the project specification. Do not select a rafter length by measuring an assumed roof plane or by matching an existing unverified rafter. The pattern rafter is the only rafter cut before test-fitting; every other rafter is traced from the pattern only after the pattern has been corrected and verified at both roof sides.
Confirm that the birdsmouth seat cut does not exceed the approved depth limit stated on the roof plan or supplied project data before cutting the heel and seat cuts on the pattern rafter. An oversized birdsmouth reduces the rafter's effective depth at its most heavily loaded point and is a stop-work condition until the pattern is corrected.
Support the ridge board with temporary posts or bracing at the calculated elevation before releasing workers to set rafter pairs. Do not remove ridge support or release the first rafter pair from temporary restraint until the pair is fully seated at the wall bearing and fastened at the ridge. An unsupported ridge or an unrestrained rafter pair can shift or fall under its own weight or wind load.
Use the fall-protection method identified in the project's fall-protection plan for all layout, cutting, and setting work performed at wall-top or roof height. Maintain a controlled exclusion zone below the work area during rafter setting and material handling, and clear cut-offs and loose fasteners from wall tops and roof surfaces before moving to the next rafter bay.
Rafter size, span, spacing, and the required ceiling-joist or rafter-tie thrust-resistance connection vary by jurisdiction, pitch, and loading condition. Confirm that the rafter size and tie requirement on the approved roof plan match the applicable prescriptive table or engineered design before framing, and do not substitute an unapproved rafter size or omit a specified tie or strap.
FR-079 – FR-084
Layout / Cutting / Installation Qualification
Scope: one completed common-rafter roof frame covering the full approved roof plan area, including the ridge board, all common rafter pairs at the specified spacing, gable-end framing, and all ties, clips, straps, blocking, and outlookers required by the approved roof plan.
| Document | Source | Confirmation Required |
|---|---|---|
| Approved roof plan | Design professional / plan set | Current revision on site; states span, run, pitch, ridge height, overhang, rafter size, spacing |
| Rafter and tie connector schedule | Design professional / manufacturer | Matches specified fasteners, straps, and clips |
| Prescriptive rafter table or engineered rafter design | Adopted code / qualified designer | Confirms rafter size and spacing for the given span, pitch, and load |
| Fall-protection and temporary-bracing plan | Project safety plan | Current and applicable to wall-top and roof-height work |
| Inspection approvals | Authority having jurisdiction | Ceiling-joist/rafter-tie framing inspection confirmed complete before roof loads are applied |
| Component | Quantity | Material | Finished Size | Preparation |
|---|---|---|---|---|
| Common rafters | Per approved plan spacing and roof length | Species/grade per approved plan | Length per calculated run and pitch; size per plan | Ridge plumb cut, birdsmouth seat and heel cut, tail cut, matched to verified pattern |
| Ridge board | 1 per roof run, spliced only over specified supports | Species/grade per approved plan | Length and depth per approved plan | Cut square to length; splice location and method per plan |
| Rafter ties / collar ties | Per approved plan spacing | Per approved plan | Per approved plan | Cut and fastened per specified connection detail |
| Gable-end studs and framing | Per approved plan | Per approved plan | Per approved plan geometry | Cut to match roof pitch; installed per plan spacing |
| Outlookers / blocking | Per approved plan | Per approved plan | Per approved plan | Cut and installed at gable overhang per plan detail |
| Joint | Fastener / Hardware | Installation Requirement |
|---|---|---|
| Rafter to ridge board | Per approved connector schedule | Toe-fastened or clipped per plan; full contact at ridge plumb cut required before fastening |
| Rafter to wall plate (birdsmouth) | Per approved connector schedule | Hurricane clip, strap, or toe-fastener per plan; full seat-cut bearing required |
| Rafter tie / collar tie to rafter | Per approved connector schedule | Fastened at the specified height and spacing to complete the thrust-resistance system |
| Ridge splice | Per approved connector schedule | Located only over a specified support; do not splice at midspan without plan approval |
| Gable framing and outlookers | Per approved connector schedule | Fastened per plan detail without altering required roof plane or overhang |
| Check | Standard |
|---|---|
| Ridge height and plumb | Matches the approved plan elevation and remains plumb through the setting sequence |
| Rafter spacing | Matches the approved plan spacing at every layout point along the wall plate and ridge |
| Birdsmouth bearing and depth | Full seat contact on the wall plate; depth does not exceed the approved plan limit |
| Roof plane and symmetry | Both roof planes align with the string-line check within the approved plan tolerance |
| Overhang | Matches the approved plan dimension at every rafter tail |
| Connection completeness | Every rafter, ridge, tie, and gable connection matches the approved connector schedule |
Inspect the completed roof frame using the same checks regardless of which bay or rafter pair it covers.
Complete the Roof Geometry Inspection Checklist in the Inspection Checklist section below before beginning Project 16.
Probable cause: the rafter length was calculated from an incorrect run, the ridge-shortening allowance was omitted, or the plumb cuts were laid out from the wrong reference edge.
Confirmation: re-measure the actual run at the roof, re-check the calculated rafter length and ridge-shortening allowance against the approved method, and re-verify the reference edge used for layout.
Correction: re-lay out and re-cut the pattern rafter from corrected values; do not force an incorrect pattern into position or shim a permanent gap at the ridge or seat cut.
Reinspection: repeat the pattern test-fit at both roof sides before duplicating the rafter.
Probable cause: the seat cut or heel cut was marked without checking the plan's stated depth limit, or the rafter stock's actual depth differs from the assumed nominal size.
Confirmation: measure the actual birdsmouth depth on the pattern rafter and compare it against the approved plan limit.
Correction: discard the pattern rafter and re-lay out the seat cut within the approved depth using the actual rafter stock dimensions; do not use a rafter with an oversized birdsmouth.
Reinspection: repeat the birdsmouth depth check on the corrected pattern before cutting.
Probable cause: temporary ridge bracing was insufficient or was adjusted unevenly while rafter pairs were being set.
Confirmation: sight and string the ridge line along its full length and identify the location and magnitude of any deviation.
Correction: adjust temporary bracing to straighten the ridge before installing additional rafter pairs, and re-fasten any rafter connection disturbed by the adjustment.
Reinspection: repeat the string-line check after adjustment and before installing permanent ties.
Probable cause: the layout marks on the wall plate or ridge were not transferred consistently, or a rafter shifted during fastening.
Confirmation: re-measure spacing between adjacent rafters at the wall plate and at the ridge and compare against the approved plan spacing.
Correction: loosen and reposition the affected rafter to the marked layout location before completing permanent fastening; do not leave a rafter fastened off its layout mark.
Reinspection: repeat the spacing check across the full roof length once the correction is complete.
Probable cause: the roof centerline was struck incorrectly, or one side's rafters were cut or set from a different reference than the other side.
Confirmation: re-verify the roof centerline against the approved plan and compare rafter length, seat-cut location, and overhang on both roof sides.
Correction: correct the centerline or the affected side's rafters using the verified pattern before installing sheathing; obtain direction from the design professional if the discrepancy affects framing already permanently fastened.
Reinspection: repeat the symmetry check at multiple points along the roof length.
Probable cause: the connector schedule was not checked before proceeding to the next rafter pair, or a connection was left for later and not tracked.
Confirmation: compare every installed rafter, ridge, tie, and gable connection against the approved connector schedule.
Correction: install the missing or incomplete connection using the specified fastener, strap, or clip before sheathing covers the connection.
Reinspection: repeat the connection check for the affected bay and confirm no other bay has the same omission.
This project ends with a complete, inspected rafter frame, not with sheathing installed.
| Competency | Independent Pass Standard | Not Demonstrated | With Assistance | Independently |
|---|---|---|---|---|
| FR-079 | Calculates common-rafter run and length correctly from the approved roof plan and supplied project data | |||
| FR-080 | Marks the ridge plumb cut, birdsmouth seat cut, heel location, and tail cut correctly on a pattern rafter from defined references | |||
| FR-081 | Cuts common rafters that match the verified pattern with consistent orientation and legible labeling | |||
| FR-082 | Installs and supports the ridge board at the calculated elevation through the rafter-setting sequence | |||
| FR-083 | Sets rafter pairs at the approved spacing with full seat bearing and installs specified ties, straps, blocking, and gable framing | |||
| FR-084 | Inspects roof geometry, including spacing, seat bearing, ridge contact, roof plane, overhang, and pitch, and correctly resolves or refers every discrepancy found |
Mark one column per competency. Only Demonstrated Independently awards the competency; Demonstrated with Assistance authorizes additional supervised practice but does not complete the requirement.
| Check | Plan Value / Requirement | Field Value | Within Tolerance (Y/N) | Correction (if any) |
|---|---|---|---|---|
| Ceiling-joist/rafter-tie inspection | Complete before roof framing | |||
| Common-rafter run | ||||
| Common-rafter length | ||||
| Ridge elevation | ||||
| Rafter spacing | ||||
| Birdsmouth depth | Within approved limit | |||
| Overhang | ||||
| Ridge and eave line straightness | Within approved tolerance | |||
| Rafter, ridge, tie, and gable connections | Matches connector schedule |
Open discrepancies attached: ____________ Responsible authority for each: ____________
Roof-framing readiness declared: ______ (Pass/Fail) Date: ____________ Builder name: ____________
With reference layout, rafter calculation, pattern verification, ridge setting, rafter installation, and restraint complete, review the finished roof frame against the Acceptance Standards table and confirm ridge height and plumb, rafter spacing, birdsmouth bearing and depth, roof plane symmetry, overhang, and connection completeness all match the approved plan. Complete and sign the roof-framing record before material is staged for roof sheathing in Project 16. If a discrepancy remains open, identify the responsible authority and required decision before proceeding.
You have completed the fourteenth project in the residential framing sequence: framing a simple gable roof with site-built common rafters. This project required you to calculate common-rafter run and length from the approved plan (FR-079), mark the ridge plumb cut, birdsmouth, and tail cut on a pattern rafter (FR-080), cut matching common rafters from the verified pattern (FR-081), install and support the ridge board at the calculated elevation (FR-082), set rafter pairs at the approved spacing with required ties and connectors (FR-083), and inspect the completed roof geometry (FR-084).
You now have a complete, inspected rafter frame ready for roof sheathing. That frame carries directly into the next project: installing the structural roof deck over this rafter system, or, on a separate designated structure, installing a prefabricated truss roof using the method taught in Project 15.
Protect the verified pattern rafter, the ridge and eave reference lines, and all installed ties and connectors established in this project. Project 16 depends on this roof geometry remaining undisturbed.