Chapter 9
Install one approved open, closed-cut, or woven asphalt-shingle valley, coordinating both adjoining roof planes over the required valley membrane and metal so that water is carried downslope without exposed fasteners or interrupted shingle laps.
These cues appear at the point of work. They identify safety, code, manufacturer, and measurement issues before they become rework or hazards.
Task-specific safety guidance for ordinary work hazards.
Serious injury, fall, or major damage is possible.
Practical work-area safety: footing, weather, housekeeping, and access.
Local requirements vary. Verify permit, inspection, and jurisdictional rules.
Follow product-specific instructions for materials, fastening schedules, and equipment.
Slope, span, clearance, and reference-point guidance.
This chapter qualifies you to install one complete asphalt-shingle valley, using the approved open, closed-cut, or woven method, on a dedicated valley assembly or on a roof where the adjoining shingle fields have been staged for integrated installation. The finished work product is a clean, continuous valley that carries water downslope without exposed fasteners, reverse laps, or interrupted shingle courses.
You will confirm the approved valley type and its compatibility with both adjoining roof slopes and the selected shingle product, verify that valley membrane and any approved valley metal are already in place, establish the valley centerline and fastener-exclusion zone, coordinate courses from both adjoining roof planes as they cross the valley, cut and finish the valley by the approved method, and inspect the completed valley for water-path integrity before higher courses or ridge work conceal it.
Valleys are the single highest-volume drainage feature on most sloped roofs. A valley built with a narrowed water channel, an exposed fastener, or a broken shingle lap will leak regardless of how well the rest of the roof is installed. This chapter treats the valley as its own controlled assembly, integrated with — not layered on top of — the surrounding shingle field.
This chapter depends directly on the roof-edge, membrane, and underlayment work completed in Chapters 3 through 5, and on the layout and starter-strip work completed in Chapters 6 and 7. The general shingle-field technique from Chapter 8 carries forward here, applied specifically to the valley intersection of two roof planes.
The valley must be built while the surrounding shingle courses are installed, one course at a time on each adjoining plane. It is not a detail that can be added after both fields are shingled. This coordination requirement carries forward into Chapter 10 (sidewall step flashing), Chapter 11 (headwall and apron flashing), and Chapter 12 (penetration flashing), which follow the same course-by-course integration principle, and into the Chapter 20 capstone, which installs any valley present on the approved shed design using this same procedure.
This chapter covers:
This chapter does not authorize the learner to:
Establish these references before shingling begins, and use them consistently across both adjoining roof planes.
| Term | Definition |
|---|---|
| Open valley | A valley in which the approved valley metal remains exposed between trimmed shingle edges on both adjoining planes |
| Closed-cut valley | A valley in which shingles from one adjoining plane run continuously across the valley and are covered by shingles from the second plane, with the upper layer cut along an approved cutline |
| Woven valley | A valley in which shingle courses from both adjoining planes alternate, overlapping across the valley without a cutline, used only where the product and roof geometry permit it |
| Valley centerline | The reference line marking the low point of the valley, used to establish the cutline and the no-fastener zone |
| No-fastener zone | The marked area adjacent to the valley center or metal within which fasteners are prohibited |
| Cutline | The approved line, offset from the centerline by the specified distance, along which the upper shingle layer of a closed-cut valley is trimmed |
| Clipped corner | The upper corner of a valley-crossing shingle, trimmed at an angle where required to direct water into the valley |
Before beginning shingle installation, record the controlling references directly on the project record:
Project / address: ______ Approved valley type: ______ Roof planes joined: ______ / ______
Valley membrane and metal reference (Chapters 3–4 record): ______ No-fastener zone width: ______
Date started: ____________ Installer name: ____________
A valley is not a repair to a finished roof plane; it is a coordinated intersection of two planes built together, course by course, from the lower end toward the ridge. The membrane and any metal installed in Chapters 3 and 4 already establish the water path beneath the shingles. This chapter's job is to keep that path clear as the shingle field crosses it — never to insert a valley after the fact and never to interrupt the shingle-lap order that carries water from upper courses onto lower ones.
Shingle both adjoining roof planes together as they approach the valley, matching course exposure and joint offset from each plane's own layout lines established in Chapter 6. Do not complete one entire roof plane and then start the second; the valley method you are using controls which plane crosses first and how the second plane laps over or weaves with it.
Do not attempt to insert a new valley beneath two completed shingle fields. This creates hidden reverse laps and unverifiable fastening conditions that cannot be corrected without removing the surrounding roofing. If a valley must be added to an already-shingled roof, that work requires an approved repair detail and is outside this chapter's scope.
Maintain secure footing on the valley slope, which is steeper and more exposed than the surrounding field at the point where two planes meet. Direct all cutting strokes away from your body and away from installed membrane and metal.
Mark the no-fastener zone from the valley centerline or metal edge using the width specified in the roofing-system specification or manufacturer instructions before installing any valley-adjacent shingle. Do not estimate this width by eye.
Apply sealant only at the specific concealed locations identified by the shingle or valley-metal manufacturer for the selected valley type. Sealant is not a substitute for the cutline, lap, or fastening-exclusion requirements set out in this chapter.
RF-049 – RF-054
Shingle Installation / Water-Path Control
Deliverable: one continuous open, closed-cut, or woven asphalt-shingle valley, built over the approved membrane and metal, with coordinated course exposure and joint offset from both adjoining roof planes, an unobstructed no-fastener zone, a straight and symmetrical cutline or opening where applicable, and a completed inspection record with photographs.
| Document | Confirmed Current | Notes |
|---|---|---|
| Roofing-system specification (valley type) | ||
| Shingle manufacturer instructions | ||
| Valley membrane and metal manufacturer instructions | ||
| Chapter 4 membrane installation record | ||
| Chapter 6 layout record for both adjoining planes |
| Check | Standard |
|---|---|
| Valley method | Matches the type authorized by the roofing-system specification for both adjoining slopes and the selected shingle product |
| Membrane and metal | Confirmed installed in low-to-high shingle-lap order before valley shingling begins |
| No-fastener zone | Marked at the specified width; free of fasteners on inspection |
| Cutline (closed-cut) or opening (open valley) | Straight, symmetrical, offset from centerline by the specified distance |
| Course coordination | Exposure and joint offset from both adjoining planes maintained through the valley |
| Water channel | Free of cutoffs, loose granules, nails, and excess sealant |
| Verification | Approved local visual or controlled water-path observation completed and documented, not represented as a whole-roof test |
Apply the same checks to every valley, regardless of the roof's overall size or configuration.
Complete the Valley Inspection Record in the Inspection Checklist section below before installing higher courses or beginning ridge work.
Probable cause: the cutline was marked freehand or in short segments without a continuous straightedge or chalk-line reference, or the centerline reference drifted from the membrane or metal edge.
Confirmation: recheck the marked cutline against the valley centerline at several points along its length using a tape measure.
Correction: remark the cutline from a verified centerline reference before cutting any additional shingle, and recut any already-cut shingle that does not match the corrected line.
Reinspection: sight the full cutline from the lower end of the valley to confirm a straight, symmetrical result.
Probable cause: the zone was not marked before fastening began, or a fastener drifted from its intended location during installation.
Confirmation: measure the fastener's distance from the valley centerline or metal edge and compare it to the specified zone width.
Correction: remove the fastener, seal the resulting hole only if the manufacturer instructions specifically authorize sealing a fastener hole in this location, and refasten the shingle at an approved location outside the zone.
Reinspection: recheck the corrected area and the surrounding zone for additional misplaced fasteners.
Probable cause: the cutline or opening was marked too close to the centerline, or a course was installed without checking the offset before fastening.
Confirmation: measure the channel width at several points along the valley and compare to the specified minimum.
Correction: remove and reinstall the affected valley-crossing shingles at the correct offset; do not attempt to widen the channel with sealant or trimming after fastening.
Reinspection: remeasure the corrected sections and confirm the full valley length meets the specified width.
Probable cause: the two planes were shingled independently without checking each course against the valley coordination steps in this chapter.
Confirmation: compare the exposure and course lines from each plane at the valley edge against the Chapter 6 layout record for that plane.
Correction: adjust the affected courses on the plane that has drifted from its layout lines, working from the nearest verified reference, before continuing upslope.
Reinspection: recheck both planes' exposure at the valley edge after correction and before installing the next course.
Probable cause: cutoffs, granules, or excess sealant were not cleared after cutting or fastening operations.
Confirmation: visually inspect the full valley length from an approved position before higher courses are installed.
Correction: remove all debris and excess sealant from the channel; do not cover a contaminated channel with additional courses.
Reinspection: recheck the cleared channel immediately before the next course is installed over it.
Probable cause: an undetected reverse lap, an exposed fastener, an insufficient cutline offset, or a defect in the underlying membrane or metal from Chapter 4.
Confirmation: repeat the approved observation while inspecting the valley section by section rather than as a whole, checking laps, fasteners, and cutline placement at each section.
Correction: remove and correct the specific defective section identified; do not add sealant across the valley as a substitute for the actual defect.
Reinspection: repeat the local observation on the corrected section only, under the same conditions used in Step 20.
This chapter ends with a clean, inspected valley and a documented record, not exposed cutoffs or unmarked corrections.
| Competency | Independent Pass Standard | Not Demonstrated | With Assistance | Independently |
|---|---|---|---|---|
| RF-049 | Correctly identifies the approved valley type and confirms its compatibility with both adjoining roof slopes and the selected shingle product before installation begins | |||
| RF-050 | Verifies valley membrane and any approved valley metal are complete and correctly sequenced before installing valley shingles | |||
| RF-051 | Installs valley shingles from both adjoining roof planes in coordinated, low-to-high sequence with matched exposure and joint offset | |||
| RF-052 | Cuts valley lines using the approved method for the selected valley type without cutting underlying shingles, membrane, or metal | |||
| RF-053 | Maintains an unobstructed water path, keeping fasteners, debris, and sealant out of the valley channel | |||
| RF-054 | Inspects and documents the completed valley for laps, cutline accuracy, fastening exclusion, and drainage continuity before it is covered |
Mark one column per competency. Only Demonstrated Independently awards the competency; Demonstrated with Assistance authorizes additional supervised practice but does not complete the requirement.
| Item | Condition Found | Correction Required | Corrected (Y/N) | Reinspection Result |
|---|---|---|---|---|
| Valley method authorization | ||||
| Membrane and metal condition | ||||
| No-fastener zone | ||||
| Cutline / opening straightness and offset | ||||
| Course exposure coordination | ||||
| Clipped corners (where required) | ||||
| Sealant locations | ||||
| Water channel housekeeping | ||||
| Local water-path observation |
Valley completion decision: ______ (Proceed to Higher Courses / Corrections Required / Stop-Work) Date: ____________ Installer name: ____________
With the valley complete, review the Valley Inspection Record against the Acceptance Standards table and confirm the valley method matches the approved specification for both adjoining slopes, membrane and metal were verified before shingling, the no-fastener zone is clear on inspection, the cutline or opening is straight and symmetrical at the specified offset, course exposure and joint offset are coordinated between both planes, the water channel is free of debris and excess sealant, and the approved local water-path observation is complete and documented with its limits stated. Correct every outstanding item and recheck the affected section before installing higher courses or beginning ridge work.
You have completed the roof-valley chapter in the shingle-installation sequence: integrating two adjoining roof planes into one continuous, water-controlled valley. This chapter required you to identify the approved valley type and confirm its compatibility with both roof slopes and the shingle product (RF-049), verify valley membrane and metal preparation (RF-050), install valley shingles in coordinated sequence (RF-051), cut valley lines using the approved method (RF-052), maintain the water path (RF-053), and inspect the completed valley for water-control integrity (RF-054).
You now have a documented, inspected valley that the surrounding shingle field and every later chapter depend on. That record carries forward into the remaining flashing chapters, which use the same course-by-course integration principle at sidewalls, headwalls, and penetrations, and into the Chapter 20 capstone, which applies this exact valley procedure to the approved shed design where a valley condition is present.
Store the completed Valley Work Record, photographs, and inspection findings with the project record before installing higher courses or beginning ridge work.