Project 13
Install an approved vertical board-and-batten siding system on a prepared wall or separate practice elevation, maintaining plumb, balanced module width, ventilation, and drainage over the completed Project 10 rainscreen and Project 11 layout.
These cues appear at the point of work. They identify safety, code, manufacturer, and measurement issues before they become rework, disputes, or concealed defects.
Task-specific safety guidance for ordinary work hazards.
Serious injury or major structural consequence is possible.
Practical work-area safety: footing, debris, access, and exposure.
Local requirements vary. Verify permit, inspection, and jurisdictional rules.
Follow product-specific instructions for boards, battens, and fasteners.
Clearance, dimension, tolerance, and reference-point guidance.
This project qualifies you to install an approved vertical board-and-batten siding system on one prepared wall elevation, or on a separate practice elevation identified by the project specification, using the rainscreen, WRB, flashing, corner, and opening preparation completed in earlier projects. The finished work product is a plumb, balanced, ventilated, and correctly fastened vertical siding elevation ready for the exterior trim installed in Project 14.
You will review the selected board-and-batten system, confirm that the rainscreen and structural fastening support suit vertical cladding, verify WRB, flashing, trim, corners, openings, and base drainage, develop a balanced layout from a centerline or corner reference, transfer vertical control lines, stage and condition the siding, cut and install the first board and every successive board while maintaining the approved joint relationship, fit boards around openings and penetrations, install battens over the joints, install top and bottom closures, and inspect and document the completed elevation.
This project follows Project 11, which established the siding layout and starter and corner components, and Project 10, which installed the rainscreen furring and drainage mat this siding is fastened through. Chapter 12 covers horizontal lap siding as a separate approved cladding system; this project and Chapter 12 install on separate walls or practice elevations unless the approved design specifically includes a transition between the two.
The rainscreen fastening support confirmed in Project 10 and the layout and corner components installed in Project 11 only function correctly if the siding installed here maintains their designed drainage gap, ventilation path, and module spacing. The plumb boards and centered battens installed in this project establish the reference surface that Project 14's exterior trim must align with, and any cumulative drift left uncorrected here becomes a visible and functional defect at every window, door, and corner trim installed afterward.
This project uses the same balanced-layout and control-line method taught for horizontal lap siding in Chapter 12, adapted to a vertical orientation. Keeping the two cladding systems on separate elevations, as required by the System-Sequence Control section of this book, allows you to compare their layout, fastening, and joint-maintenance methods without mixing their component schedules.
This project covers:
This project does not authorize the learner to:
Any condition where the rainscreen fastening support, WRB, flashing, or opening preparation has not passed inspection, or where the approved module cannot be achieved within the product's permitted range, must stop work in that area until direction is obtained.
Establish these references before any layout, cutting, or fastening begins, and do not change them once the vertical control lines are transferred.
| Term | Definition |
|---|---|
| Module width | The combined width of one board plus one adjoining open joint, shiplap engagement, or edge relationship, as specified by the approved board-and-batten system |
| Control line | A vertical reference line transferred across the elevation at the interval specified in Step 6, used to check plumb and module drift during installation |
| Centerline or corner reference | The starting reference point specified by the approved layout from which the board-and-batten module is developed outward in both directions or from one corner |
| Batten coverage | The required minimum distance a batten must extend beyond each edge of the joint it covers, as specified by the approved system |
| Independent fastening | Fastening the batten directly into the required backing without relying on the boards beneath it for support, as required by systems that specify this method |
| Movement gap | The clearance maintained at joints and terminations that allows board and batten movement without splitting or buckling, per the approved system |
Before beginning layout, record the controlling references directly on the siding installation record:
Elevation ID: ______ Board-and-batten product and profile: ______ Board width / batten width: ______ / ______ Joint relationship (open joint / shiplap / other): ______
Centerline or corner starting reference: ______ Control-line interval: ______ Date started: ____________ Builder name: ____________
Vertical board-and-batten siding depends on the same drainage-plane principles as every other cladding system in this book: water sheds down the face of the boards and battens, exits at the base without obstruction, and the rainscreen cavity behind the cladding remains open for ventilation and drying. The batten's role is decorative and joint-covering only; it is not a substitute for the open joint, shiplap engagement, or drainage gap that the approved system relies on for water management.
Measure the wall width and calculate the board-and-batten module before making the first cut. If the calculated layout produces a narrow terminal piece at a corner, opening, or termination, adjust the module within the product's permitted range rather than installing an undersized piece. Do this calculation once, record it on the siding installation record, and use it for every board on the elevation; do not recalculate the module partway across the wall.
Recheck board plumb and module width at the control-line interval specified in Step 13, not only at the start of the elevation. Vertical siding makes cumulative drift visible over the full wall height, and a small module error repeated across many boards becomes a large, uncorrectable gap by the far corner if it is not caught early.
Do not operate a circular saw, track saw, or jigsaw from an unsecured ladder or unsupported platform. Cut boards and battens at a supported cutting station at grade or on a secured platform, then carry finished pieces to the installation location. Disconnect power and engage the blade guard before adjusting or clearing any saw.
Vertical boards run the full wall height and are longer and more awkward to handle than horizontal courses. Use the number of workers required to control the board without contacting powerlines, scaffolding edges, or ladder positions, and lower or lay down boards fully before repositioning ladders or platforms.
Confirm that the rainscreen furring installed in Project 10 provides the horizontal backing required for vertical board-and-batten siding before beginning layout. If the furring was installed in a vertical-only orientation for a different cladding system, do not fasten boards into unsupported drainage mat or WRB; stop work and obtain the cross-furring or support pattern specified for this system.
Minimum siding clearances above grade, roofs, decks, and paving vary by adopted code and jurisdiction. Verify the current clearance requirement with the authority having jurisdiction before installing the bottom course or closure.
BE-073 – BE-078
Layout / Installation / Inspection Qualification
Scope: one completed vertical board-and-batten siding installation covering the prepared wall elevation, or the separate practice elevation, identified in the approved project specification, including boards, battens, top and bottom closures, and fitted openings and penetrations.
| Document | Source | Confirmation Required |
|---|---|---|
| Board-and-batten product instructions | Manufacturer | Board width, batten width, joint relationship, and fastening pattern confirmed |
| Rainscreen and structural fastening record | Project 10 inspection record | Furring orientation and backing confirmed suitable for vertical cladding |
| Siding layout and corner record | Project 11 inspection record | Base reference, corner components, and clearances confirmed |
| WRB, flashing, and penetration records | Projects 2–9 and 16 inspection records | Confirmed passed for the affected elevation before siding begins |
| Change documentation | Design professional / general contractor | All approved field changes incorporated |
| Component | Quantity | Material | Finished Size | Preparation |
|---|---|---|---|---|
| Vertical siding boards | Per elevation coverage calculation | Approved board product per project specification | Cut to wall height less required top and bottom clearances | Field-cut ends sealed or primed where required by the manufacturer |
| Battens | One per board joint per the approved layout | Approved batten product matching the siding system | Cut to wall height less required top and bottom clearances, matching board length | Field-cut ends sealed or primed where required by the manufacturer |
| Top closure / venting component | Per elevation width | Approved product specified by the board-and-batten system | Cut to elevation width at the top termination | Installed per manufacturer sequence |
| Bottom closure / screen component | Per elevation width | Approved product specified by the board-and-batten system | Cut to elevation width at the base termination | Installed while keeping the drainage outlet open |
Do not substitute a board width, batten width, or closure component not identified in the approved board-and-batten product instructions. Record the actual board and batten count used on the siding installation record.
| Joint | Fastener | Installation Requirement |
|---|---|---|
| Board to furring | Corrosion-resistant fastener per the approved fastening schedule | Location, spacing, and embedment as specified by the manufacturer; seated without overdriving |
| Batten to backing | Corrosion-resistant fastener per the approved fastening schedule, installed independently of the boards where required | Centered over the joint, fastened into the backing specified by the manufacturer, not fastened through the boards alone |
| Top and bottom closures | Fastener type specified by the closure manufacturer | Installed without blocking the ventilation or drainage opening |
Manufacturer instructions control the exact fastener diameter, length, and spacing for the approved product. Do not treat "siding fastener" or "exterior screw" as a complete specification; confirm the manufacturer's schedule before the first fastener is driven.
| Check | Standard |
|---|---|
| Board plumb | Each board plumb within the tolerance specified by the approved system, verified at the required control-line interval |
| Module width | Consistent board-and-batten module across the elevation, matching the calculated layout within the product's permitted range |
| Batten centering | Each batten centered over its joint with the required minimum coverage beyond each edge |
| Fastening | Fasteners seated per the manufacturer's schedule without overdriving, splitting, or restricting required movement |
| Movement gaps | Required clearance maintained at joints and terminations without splitting or buckling |
| Clearances | Required clearances maintained at roofs, decks, grade, and paving |
| Drainage and ventilation | Rainscreen cavity, base venting, and top closures remain open and unobstructed |
Inspect the completed elevation using the same checks regardless of which wall it covers.
Complete the Siding Installation Record in the Inspection Checklist section below before beginning Project 14.
Probable cause: the layout calculation in Step 4 was not followed consistently, or a board was installed slightly wider or narrower than specified without rechecking against the control lines.
Confirmation: measure the module width at each control-line interval and compare against the calculated layout recorded on the siding installation record.
Correction: remove and reset boards back to the last correct control line, then reinstall using the specified module width.
Reinspection: recheck module width at every control line across the corrected section before continuing.
Probable cause: a fastener was driven too close to the board or batten edge, or without a required pilot hole, or the material was not conditioned per manufacturer requirements before installation.
Confirmation: inspect the split location and compare fastener placement against the approved fastening schedule.
Correction: remove and replace the split component; do not fasten through or patch a split board or batten.
Reinspection: confirm the replacement component is fastened per the schedule and remains free of new splits.
Probable cause: the batten was not centered before fastening, or the batten width does not match the specified coverage for the installed module width.
Confirmation: measure the coverage beyond each edge of the joint and compare against the manufacturer's required minimum.
Correction: remove and reposition the batten, or replace it with the correct width specified by the manufacturer.
Reinspection: recheck coverage at both edges of the joint after correction.
Probable cause: the rainscreen furring installed in Project 10 does not provide the horizontal backing this vertical system requires at the fastened location.
Confirmation: probe the fastening location and confirm whether the fastener reaches solid furring or only drainage mat and WRB.
Correction: stop work, remove the affected board, and install the cross-furring or support pattern specified for this system before refastening.
Reinspection: confirm fastener embedment into solid backing at every location across the corrected section.
Probable cause: the bottom closure, insect screen, or top venting component was installed without maintaining the open path established in Project 10.
Confirmation: inspect the base and top terminations for continuous, unobstructed openings.
Correction: remove and correct the closure installation to restore the required open path.
Reinspection: confirm the drainage and ventilation path remains open along the full width of the elevation.
This project ends with a completed, inspected vertical board-and-batten siding elevation, not with exterior trim or sealant installed.
| Competency | Independent Pass Standard | Not Demonstrated | With Assistance | Independently |
|---|---|---|---|---|
| BE-073 | Lays out a balanced vertical board-and-batten module from a defined centerline or corner reference and transfers vertical control lines across the elevation | |||
| BE-074 | Measures, cuts, and installs vertical siding boards plumb and in the approved starting sequence and reference | |||
| BE-075 | Maintains the approved open joint, shiplap engagement, or edge relationship and module width across the elevation, including at openings and penetrations | |||
| BE-076 | Measures, cuts, and installs battens straight and centered over board joints using the specified independent fastening method | |||
| BE-077 | Fastens boards and battens without distortion, splitting, or restriction of required movement, while maintaining clearances at roofs, decks, grade, and paving | |||
| BE-078 | Inspects the completed elevation for plumb, batten centering, spacing, fastening, movement gaps, clearances, and surface condition, and corrects deficiencies before closeout |
Mark one column per competency. Only Demonstrated Independently awards the competency; Demonstrated with Assistance authorizes additional supervised practice but does not complete the requirement.
| Check | Plan Value / Requirement | Field Value | Within Tolerance (Y/N) | Correction (if any) |
|---|---|---|---|---|
| Rainscreen furring orientation | Suitable for vertical cladding per Project 10 | |||
| Prior projects passed | WRB, flashing, trim, corners, openings, base drainage confirmed | |||
| Module width | Matches calculated layout within permitted range | |||
| Board plumb (per control line) | Within manufacturer tolerance | |||
| Joint relationship | Matches approved open joint, shiplap, or edge relationship | |||
| Batten centering and coverage | Centered with required minimum coverage each edge | |||
| Fastening | Matches approved fastening schedule | |||
| Movement gaps | Maintained at joints and terminations | |||
| Clearances (roof/deck/grade/paving) | Meets required minimums | |||
| Base and top ventilation | Open and unobstructed |
Open discrepancies attached: ____________ Responsible authority for each: ____________
Siding installation decision: ______ (Proceed/Conditional-Proceed/Stop-Work) Date: ____________ Builder name: ____________
With layout, board installation, batten installation, closures, and inspection complete, review the elevation against the Acceptance Standards table and confirm every board is plumb within tolerance, the module width is consistent across the elevation, every batten is centered with the required coverage, fastening matches the approved schedule without splitting or restricting movement, required clearances are maintained, and base and top ventilation remain open. Complete and sign the siding installation record before exterior trim material is staged for Project 14. If a discrepancy remains open, identify the responsible authority and required decision before proceeding.
You have completed Project 13 in the building-envelope sequence: installing vertical board-and-batten siding. This project required you to lay out a balanced module and transfer vertical control lines (BE-073), measure, cut, and install boards plumb in the approved sequence (BE-074), maintain the approved joint relationship and module width across the elevation (BE-075), measure, cut, and install battens with the specified coverage and fastening (BE-076), fasten boards and battens without distortion or restricted movement while maintaining clearances (BE-077), and inspect the completed elevation and correct deficiencies before closeout (BE-078).
You now have a plumb, balanced, ventilated, and securely fastened vertical board-and-batten siding elevation with a signed siding installation record. That accepted elevation carries directly into the next project: installing exterior trim around the windows and doors on this and the Chapter 12 elevation.
Protect the plumb boards, centered battens, and open drainage and ventilation paths established in this project. Project 14 installs trim directly against this siding and depends on every clearance and reference confirmed here.