Project 04
Establish the casing reveal, cut and fit head and side casing, fasten the assembly to jamb and framing, and inspect the completed door-trim installation for reveal consistency, joint alignment, and unimpaired door operation.
These cues appear at the point of work. They identify safety, code, manufacturer, and measurement issues before they become rework, callbacks, or hazards later in the book.
Task-specific safety guidance for ordinary work hazards.
Serious injury, fire, or major damage is possible.
Practical work-area safety: lighting, cords, footing, and housekeeping.
Local requirements vary. Verify permit, inspection, and jurisdictional rules.
Follow product-specific instructions for tools, materials, and equipment.
Clearance, layout, spacing, and reference-point guidance.
This project qualifies you to install a complete three-piece interior door-casing set: head casing and two side casings, mitered at the corners, fastened to jamb and wall framing, and held to a consistent reveal along both jamb legs and the head. The finished work product is one fully installed, permanently fastened door-casing assembly with tight, aligned miter joints and unimpaired door operation.
You will verify that the jamb is secure and operating correctly, establish the casing reveal from the Project 01 survey, measure and cut head and side casing to the required miters, dry-fit and adjust the assembly, fasten it to jamb and wall framing using the approved fastener schedule, and inspect the finished casing for reveal, plane, joint alignment, and door operation.
This project depends directly on Project 01's controlling reveal line and Project 05's prehung door jamb, and on the measuring, marking, and mitering skills developed in Project 03. The casing installed here is left with fasteners set but not yet filled or caulked; Project 18 completes that surface preparation after every trim assembly in the room is installed.
This project applies the Project 01 controlling reveal line to the first permanently installed trim assembly in the room and applies the measuring, marking, and mitering procedure from Project 03 to a finished, visible joint. It requires a jamb installed and adjusted under Project 05 and hardware operating correctly under Project 06 before the reveal is finalized against the door.
The casing method used here — establishing reveal, cutting to long point or short point as required by the miter, dry-fitting before permanent fastening, and pinning the miter without distorting the reveal — is reused directly in Project 07 for window casing and referenced again in Project 13 for rail returns and Project 14 for batten terminations.
This project covers:
This project does not authorize the learner to:
Any door opening with an unresolved jamb, hardware, or wall-plane defect must be corrected before casing begins on that opening.
Quantity: one complete three-piece casing set per door opening, consisting of one head casing and two side casings, mitered at both upper corners, fastened to jamb and wall framing.
Configuration: mitered head-and-side casing following the reveal, profile, and finish grade set by the approved trim schedule and finish specification for the room.
Intended use: permanent interior trim concealing the gap between the door jamb and the surrounding wall opening while preserving door operation.
Main limitations: this project does not correct jamb, hardware, or wall-plane defects; those are corrected under Projects 01, 05, and 06 before casing is measured.
| Component | Quantity | Material | Finished Size | Preparation |
|---|---|---|---|---|
| Head casing | 1 per opening | Profile and grade per trim schedule | Length and miter angles per marked reveal; see Section G, Step 2 | Both ends mitered per the marked reveal; profile orientation preserved |
| Side casing (hinge side) | 1 per opening | Profile and grade per trim schedule | Length and top miter per marked reveal; bottom end per finish specification | Top end mitered; bottom end square or profiled as specified |
| Side casing (strike side) | 1 per opening | Profile and grade per trim schedule | Length and top miter per marked reveal; bottom end per finish specification | Top end mitered; bottom end square or profiled as specified |
The trim schedule and finish specification identified in Project 01 control profile, dimensions, and finish grade. Do not substitute a different profile or dimension without a documented revision to those controlling documents.
| Joint | Fastener | Installation Direction | Pilot/Clearance | Final Seating Condition |
|---|---|---|---|---|
| Head casing to jamb | Finish fastener per fastener schedule | Through casing into jamb, near the inner edge | Per fastener schedule; pilot-drilled where stain-grade or prone to splitting | Head set flush to slightly below surface without crushing the profile |
| Head and side casing to wall framing | Finish fastener per fastener schedule | Through casing into stud or approved backing at the outer edge | Per fastener schedule | Head set flush to slightly below surface without crushing the profile |
| Miter joint | Pin fastener or approved joint method per fastener schedule | Through the joint face as specified | Per fastener schedule | Joint faces held flush and tight, reveal preserved |
The fastener size, spacing, and drive type are set by the approved fastener and hardware schedule referenced in the trim schedule for this room. Adhesive at the miter joint or along the jamb leg is applied only where that schedule specifies it.
| Term | Definition |
|---|---|
| Reveal line | The marked line on the jamb face, set back from the jamb edge, that the inside edge of the casing follows |
| Long point | The longer corner of a mitered end, used as the measuring reference for miter cuts |
| Short point | The shorter corner of a mitered end |
| Reference face | The finished front face of the casing profile, kept consistent through marking and cutting |
| Head casing | The horizontal casing piece across the top of the door opening |
| Side casing | The vertical casing piece along the hinge or strike jamb leg |
| Check | Standard |
|---|---|
| Reveal consistency | Reveal matches the marked reveal line along both jamb legs and the head within the tolerance stated in the finish specification |
| Miter closure | Both head-to-side miter joints closed with no visible gap at the face under normal room light |
| Casing plane | No proud miter corner or twisted piece detectable with a straightedge across the joint |
| Fastening | Fastener pattern matches the approved fastener schedule; all heads set without crushing the profile |
| Door operation | Door swings, latches, and closes without contacting the casing at any point in its travel |
| Corrective action | Open joints, bowed casing, or inconsistent reveal corrected by recutting or replacement rather than filler; jamb or wall irregularities documented |
Door casing conceals the gap between the jamb and the rough opening, but it does not correct jamb or wall defects. The reveal marked on the jamb face is the single controlling reference for every measurement in this project: head length, side-casing length, and miter position are all taken from that line, not from the wall opening or the jamb edge itself. Establishing the reveal accurately, on all three jamb faces, before any casing is cut is the largest single factor in avoiding mismatched joints.
Mark the reveal with a combination square held against the jamb edge, scribing a light pencil line the reveal distance in from the edge on both jamb legs and the head. Measure and cut with the casing's reference face up and the profile orientation consistent on every piece; a piece cut with the profile reversed will not match its mate at the miter even if the angle and length are correct.
Do not assume both side-casing pieces are the same length. Measure each leg from its own reveal marks at the head and at the floor or baseboard reference, because floor and jamb variation identified in Project 01 can make the two legs different lengths even on the same opening.
Support casing stock fully on both sides of the saw table before cutting. Keep hands outside the marked blade exclusion zone established in Project 02, and allow the blade to come to a complete stop before lifting it or removing the cut piece.
Confirm the finish nailer's depth setting on scrap stock of the same casing profile before fastening near the finished jamb. Keep the nailer's safety tip fully depressed against the work surface and keep free hands clear of the fastening path.
Where the fastener and hardware schedule specifies an adhesive or a proprietary fastener product, follow that product's manufacturer instructions for surface preparation, open time, clamping or fastening while curing, and cure time before the joint is loaded or sanded.
FC-019 – FC-024
Installation Qualification
Apply the following checks to every casing piece before it is permanently fastened.
Probable cause: the head or side-casing miter angle was cut inaccurately, or the reveal marks on the two legs are not at the same distance from the jamb edge.
Confirmation: check both miter angles with the combination square and re-measure the reveal marks on both legs against the Project 01 controlling line.
Correction: recut the piece with the inaccurate angle, or remark the reveal from the controlling line and recut both affected pieces.
Reinspection: repeat the dry-fit and check joint closure under normal room light.
Probable cause: the side casing was fastened without holding it to the reveal marks along its full length, allowing it to drift from the line.
Confirmation: measure the reveal at the top, middle, and bottom of the affected leg and compare to the marked line.
Correction: remove the fasteners nearest the deviation, reposition the casing to the reveal marks, and refasten.
Reinspection: repeat the reveal measurement at the same three points after refastening.
Probable cause: a wall-plane irregularity identified in Project 01 was not accommodated, or the casing itself is bowed.
Confirmation: hold the straightedge across the casing at the high point and measure the gap; compare to the Project 01 surface inspection record for that wall.
Correction: for a documented wall irregularity within tolerance, scribe or shim per the finish specification; for a bowed piece, replace it.
Reinspection: repeat the straightedge check after correction and confirm the reveal is still consistent.
Probable cause: the reveal was set too close to the jamb edge on the hinge or strike side, or the casing projects beyond the jamb face into the door's travel path.
Confirmation: operate the door through its full swing and mark the point of contact.
Correction: remove and reposition the affected casing to the correct reveal, or refer the condition to Project 06 if the contact indicates a hinge or strike adjustment problem rather than a casing position problem.
Reinspection: operate the door through its full swing again and confirm no contact at any point.
Probable cause: the nail set was misaligned, the fastener was driven too close to a profile edge, or the fastener schedule's edge-distance guidance was not followed.
Confirmation: inspect the fastener location against the schedule's edge-distance requirement.
Correction: remove the damaged fastener, fill the resulting void per Project 18 procedures, and drive a replacement fastener at the correct location.
Reinspection: inspect the corrected fastener location and surrounding profile under normal light.
| Competency | Independent Pass Standard | Not Demonstrated | With Assistance | Independently |
|---|---|---|---|---|
| FC-019 | Establishes and marks the casing reveal on both jamb legs and the head from the approved controlling-line layout | |||
| FC-020 | Cuts head casing to the correct length and miter angles with profile orientation preserved | |||
| FC-021 | Measures and cuts each side casing independently to the correct length and miter angle | |||
| FC-022 | Fastens casing to jamb and wall framing using the approved fastener pattern without damaging the profile | |||
| FC-023 | Aligns and pins miter joints at the correct reveal without distorting the assembly | |||
| FC-024 | Inspects the finished casing for reveal, joint alignment, casing plane, and unimpaired door operation, and corrects defects found |
Mark one column per competency. Only Demonstrated Independently awards the competency; Demonstrated with Assistance authorizes additional supervised practice but does not complete the requirement.
| Item | Inspected (Y/N) | Defect Found (Y/N) | Corrected (Y/N) | Reinspected (Y/N) | Correction |
|---|---|---|---|---|---|
| Jamb operation verified | |||||
| Reveal marked on both legs and head | |||||
| Head casing miters | |||||
| Side casing miters (hinge side) | |||||
| Side casing miters (strike side) | |||||
| Dry-fit and joint closure | |||||
| Fastener pattern and edge distance | |||||
| Casing plane and reveal consistency | |||||
| Door operation through full swing |
Total open deficiencies: ____________ Total closed deficiencies: ____________
Jamb or wall irregularities documented: ______ Date: ____________ Inspector name: ____________
With the casing installed, review the assembly against the Acceptance Standards table and confirm the reveal is consistent along both jamb legs and the head, both miter joints are closed with no visible gap under normal room light, no proud corner or twisted piece is detectable with a straightedge, the fastener pattern matches the approved schedule with all heads set without crushing the profile, and the door swings, latches, and closes without contacting the casing at any point in its travel. Complete the Readiness Worksheet and document any jamb or wall irregularities before beginning Project 05 on the next opening or proceeding to Project 07.
You have completed the fourth project in the interior finish carpentry sequence: installing interior door casing. This project required you to establish the casing reveal on both jamb legs and the head from the approved controlling-line layout (FC-019), cut head casing to the correct length and miter angles (FC-020), cut and independently measure side casing (FC-021), fasten casing to jamb and wall framing using the approved fastener pattern (FC-022), align and pin miter joints without distorting the reveal (FC-023), and inspect the finished assembly for reveal, joint alignment, plane, and door operation (FC-024).
You now have a permanently installed door-casing assembly with fasteners set and ready for surface preparation. That assembly remains unfilled and uncaulked until Project 18, after every trim assembly in the room is complete.
Store the reveal measurements and any documented jamb or wall irregularities with the room file established in Project 01. You will reference this record again in Project 18 and in the Chapter 20 capstone.