Project 12
Install and align a controlled set of cabinet doors, drawer fronts, hinges, and slides on secured cabinet boxes, establishing consistent reveals, secure hardware, full opening clearance, and smooth self-closing operation before the pulls and knobs of Project 13 are drilled and installed.
These cues appear at the point of work. They identify safety, code, manufacturer, and measurement issues before they become misaligned doors, damaged finishes, or hardware that fails to hold its adjustment.
Task-specific safety guidance for ordinary work hazards.
Serious injury or major structural or utility consequence is possible.
Practical work-area safety: footing, access, egress, and exposure.
Local requirements vary. Verify permit, inspection, and jurisdictional rules.
Follow product-specific instructions for hinges, slides, and soft-close hardware.
Clearance, dimension, tolerance, and reference-point guidance.
This project qualifies you to install and align a controlled set of cabinet doors, drawer fronts, hinges, and drawer slides on cabinet boxes that were leveled, plumbed, joined, and structurally secured in Projects 4 through 6, and finished with fillers, end panels, and toe kicks in Project 8. The finished work product is a set of hung doors and installed drawer fronts with consistent top, bottom, and side reveals, hardware that is securely fastened and correctly adjusted, full opening clearance against walls, fillers, appliances, and adjacent doors, and smooth, repeatable, self-closing operation confirmed by repeated testing.
You will confirm the cabinet boxes are ready to receive doors and drawers, review the door and drawer design and hardware schedule, match every door, drawer front, hinge, and slide to its assigned cabinet, install hinge cups and mounting plates, hang and align doors using a controlled reveal sequence, install and align drawer boxes and fronts, adjust hardware in the specified order, install soft-close devices, and inspect the finished set for reveal consistency, security, and operation.
This project assumes the cabinet boxes have already passed the Project 4, 5, and 6 alignment and structural-fastening inspections, and that fillers, end panels, and toe kicks from Project 8 are in place. It sits immediately before Project 13, which lays out and drills pulls and knobs only after every door and drawer front installed here is fully aligned.
Every door, drawer front, hinge, and slide installed in this project depends on the cabinet-box alignment completed in Projects 4 through 6. A cabinet box that is out of level, out of plumb, or racked will not accept a consistent reveal no matter how carefully the hinge is adjusted here; that condition must be corrected in the cabinet box before this project proceeds. The reveal, hardware-adjustment, and testing method used in this project is the same method the Chapter 20 capstone inspection applies to the complete installation, and the diagnostic pattern taught here — probable cause, confirmation, correction, reinspection — is the same pattern Chapter 19 uses to repair hinge, slide, and joint defects found after occupancy.
The hardware template established for pulls and knobs in Project 13 is measured from the door and drawer-front reveals confirmed here. A reveal that is corrected informally after Project 13 hardware is drilled will misalign the finished hardware.
This project covers:
This project does not authorize the learner to:
Any door, drawer, or hinge condition that will not hold the specified reveal or adjustment after the full adjustment sequence is applied must be identified and corrected using the Failure Points and Troubleshooting section before continuing to Project 13.
Establish these references before any hinge, door, or drawer-front installation begins, and do not change them once the reveal has been accepted.
| Term | Definition |
|---|---|
| Reveal | The visible gap between a door or drawer front and the adjacent cabinet edge, filler, or door, measured at the top, bottom, and each side according to the approved door and drawer design |
| Overlay | The dimension by which a door or drawer front covers the cabinet face frame or box edge, as specified in the door and drawer design |
| Inset | A door or drawer front installed within the cabinet opening rather than over it, requiring a specified reveal on all four sides |
| Handing | The specified hinge-side orientation of a door — left-hand or right-hand — as shown on the approved cabinet and door schedule |
| Controlling reveal | The first door or drawer front's confirmed reveal in a run, used as the working reference for aligning every adjacent door or drawer front |
| Concealed location | A drawer-front or panel fastening point that is not visible on the finished face, used for permanent drawer-front attachment |
Before beginning any hinge or hardware installation, record the controlling documents and reference data directly on the adjustment log:
Room/area ID: ______ Cabinet and door/drawer schedule reference: ______ Hinge and slide model: ______ Soft-close hardware model (if specified): ______
Date started: ____________ Installer name: ____________
Every hardware-installation project in this book, from this chapter's door and drawer hanging to Project 13's pull and knob installation, follows the same order: confirm the structure is ready to receive the component, match every component to its designation, install using the specified fastener and depth, align to a controlling reference, adjust in the specified order, and inspect operation before final acceptance. Learning that sequence here protects every later hardware project in this book.
Every reveal or operation defect found during this project falls into one of two categories: a condition correctable through the manufacturer's specified hinge or slide adjustment sequence, or a condition requiring component replacement. A door that will not hold level within the adjustment range of its hinges, a warped door, or a drawer box damaged during installation is not correctable through adjustment; replace the component rather than forcing an adjustment beyond its designed range.
Set and confirm the first door's top, bottom, and side reveal against the approved door and drawer design before hanging the next door in the run. Use that confirmed reveal, not the cabinet opening alone, as the working reference for every adjacent door and drawer front. Adjusting each door independently against the cabinet opening, rather than against the confirmed controlling reveal, produces a visibly inconsistent run even when each individual door measures within tolerance.
Do not install a longer screw than the one specified for a hinge cup, mounting plate, or slide, even if a longer screw appears to hold more securely. A screw that penetrates through a door or drawer front damages the finished face and cannot be corrected without replacing the component. Confirm screw length against the specified hardware schedule before installing any hinge, plate, or slide fastener.
Place every door, drawer front, and drawer box removed for hinge or hardware work on a padded support surface, finished face up unless the specified operation requires otherwise. Do not lean removed components against unprotected surfaces or stack them in a way that can chip edges or scratch finishes.
Adjust concealed hinges in the order specified by the hinge manufacturer — typically depth, then side, then height — rather than in an order of convenience. Adjusting the axes out of the specified order can cause a later adjustment to undo an earlier one, requiring the full sequence to be repeated.
Required operating force, reach range, and clearance for cabinet doors and drawers in accessible installations vary by adopted code and jurisdiction. Verify the current requirement with the authority having jurisdiction and the general contractor before confirming that installed doors, drawers, and hardware meet an intended accessibility requirement.
CB-067 – CB-072
Installation / Alignment / Adjustment Qualification
Scope: one completed door, drawer-front, hinge, and slide installation covering every door, drawer, hinge, slide, and soft-close device assigned to the accepted cabinet run identified on the approved cabinet, door, and hardware schedules.
| Document | Source | Confirmation Required |
|---|---|---|
| Cabinet and door/drawer schedule | Designer / cabinet supplier | Every door, drawer front, overlay, inset, reveal, and handing confirmed |
| Hinge and slide schedule | Hardware supplier / manufacturer | Hinge model, boring specification, slide type, and screw specification confirmed |
| Soft-close hardware specification | Manufacturer | Device model and installation location confirmed where specified |
| Project 4/5/6 alignment inspection record | Prior project record | Cabinet boxes confirmed level, plumb, square, joined, and secured |
| Project 8 filler/panel/toe-kick record | Prior project record | Fillers, end panels, and toe kicks confirmed installed |
| Check | Standard |
|---|---|
| Reveal consistency | Top, bottom, and side reveals match the approved door and drawer design within the specified tolerance across the full run |
| Hinge and plate security | Every hinge cup and mounting-plate screw fully seated using the specified fastener without stripping or overdriving |
| Slide engagement | Every drawer slide fully engaged, level, and free of binding across its full extension |
| Opening clearance | Every door and drawer clears walls, fillers, appliances, handles, and adjacent doors through its full range of motion |
| Closing action | Every door and drawer with specified soft-close hardware closes fully and smoothly without slamming or rebound |
| Documentation completeness | Final hinge and slide adjustment settings and any damaged components are recorded on the adjustment log |
Inspect every door and drawer front using the same checks regardless of which cabinet run it covers.
Complete the Door and Drawer Installation Checklist section below before beginning Project 13.
Probable cause: a hinge-side adjustment applied out of the manufacturer's specified sequence, or a cabinet box that is not plumb.
Confirmation: check the cabinet side for plumb with the 4-foot level and measure the reveal at the top, middle, and bottom of the door.
Correction: if the cabinet is plumb, repeat the hinge adjustment in the specified depth-then-side-then-height sequence; if the cabinet is not plumb, correct the cabinet box under Project 4, 5, or 6 methods before continuing.
Reinspection: repeat the reveal measurement at the top, middle, and bottom of the door once the adjustment or cabinet correction is complete.
Probable cause: a hinge-plate screw that was not fully seated, an oversized or stripped pilot hole, or a hinge overloaded beyond its rated door weight.
Confirmation: inspect each mounting-plate screw for full seating and check the pilot-hole condition; compare the door weight against the hinge's rated capacity.
Correction: reinstall the mounting plate using the specified screw in a sound pilot hole, or an approved fastener repair where the original hole is stripped; replace the hinge if it is undersized for the door weight.
Reinspection: operate the door through five open-close cycles and recheck the reveal after the repair.
Probable cause: insufficient filler or clearance between cabinets, or a door hung with the incorrect handing.
Confirmation: compare the installed handing against the door and cabinet schedule and measure the clearance between adjacent doors at full swing.
Correction: rehang the door with the correct handing where the schedule was misread, or record the clearance conflict on the deficiency list and refer it to the designer where the filler width itself is insufficient; do not trim a door or filler beyond the specified allowance without approval.
Reinspection: operate both doors through full swing after the correction and confirm clearance against the schedule.
Probable cause: a slide that is not level, a slide member not fully engaged, or debris in the slide track.
Confirmation: check the slide for level with the 4-foot level and inspect the track for obstruction or misengagement.
Correction: relevel and reseat the slide, clean the track, and reengage the slide members per the manufacturer's instructions.
Reinspection: operate the drawer through its full extension at least five times and confirm smooth, level travel.
Probable cause: a soft-close device installed at the wrong location or engagement point, or a device not compatible with the installed slide or hinge.
Confirmation: compare the installed device and location against the manufacturer's specified engagement point and compatibility list.
Correction: reposition or replace the soft-close device per the manufacturer's instructions.
Reinspection: operate the door or drawer through at least five closings and confirm consistent, smooth engagement.
Probable cause: the drawer front was permanently fastened before the confirmed controlling reveal was verified against adjacent components.
Confirmation: measure the drawer-front reveal against the confirmed controlling reveal and the adjacent door reveals.
Correction: loosen the concealed fasteners, reposition the drawer front using spacers or clamps against the controlling reveal, and refasten.
Reinspection: recheck the drawer-front reveal against adjacent doors and cabinets after refastening.
This project ends with aligned, secured, and tested doors and drawer fronts, not with pull or knob hardware installed.
| Competency | Independent Pass Standard | Not Demonstrated | With Assistance | Independently |
|---|---|---|---|---|
| CB-067 | Installs concealed hinges to the specified boring depth, screw type, and mounting-plate configuration for the assigned door and cabinet | |||
| CB-068 | Hangs cabinet doors in the correct cabinet, orientation, and sequence without collision with walls, fillers, appliances, or adjacent doors | |||
| CB-069 | Aligns door reveals to the specified top, bottom, and side tolerances using the manufacturer's hinge-adjustment sequence | |||
| CB-070 | Installs drawer fronts aligned with adjacent doors and cabinets using the specified spacer or clamping method | |||
| CB-071 | Adjusts hinge and slide hardware for height, side, tilt, and closing action, including soft-close devices where specified | |||
| CB-072 | Inspects and documents door and drawer operation, reveal consistency, hinge security, and slide engagement |
Mark one column per competency. Only Demonstrated Independently awards the competency; Demonstrated with Assistance authorizes additional supervised practice but does not complete the requirement.
| Check | Plan Value / Requirement | Field Value | Within Tolerance (Y/N) | Correction (if any) |
|---|---|---|---|---|
| Cabinet-box readiness (Projects 4/5/6/8) | Level, plumb, square, joined, secured, with fillers/panels/toe kicks installed | |||
| Component matching | Every door, drawer, hinge, and front matched to its cabinet designation | |||
| Hinge/plate/slide fastener security | Specified screw type and length, fully seated | |||
| Top/bottom/side reveals | Matches approved door and drawer design within specified tolerance | |||
| Opening clearance | Clears walls, fillers, appliances, handles, and adjacent doors | |||
| Slide engagement and level travel | Fully engaged, level, free of binding through full extension | |||
| Closing action / soft-close performance | Closes fully and smoothly across repeated cycles without slamming | |||
| Damaged or set-aside components | Identified and recorded with reason |
Open discrepancies attached: ____________ Responsible party for each: ____________
Door and drawer installation decision: ______ (Approved/Conditional/Rejected) Date: ____________ Installer name: ____________
With cabinet-box confirmation, component matching, hinge and plate installation, door hanging and reveal alignment, drawer installation, hardware adjustment, and repeated operation testing complete, review the finished run against the Acceptance Standards table and confirm reveals are consistent across the run, every hinge, plate, and slide fastener is fully seated, every door and drawer clears its full range of motion, and every specified soft-close device closes smoothly and consistently. Complete and sign the adjustment log before Project 13 hardware locations are laid out. If a discrepancy remains open, identify the responsible correction before proceeding.
You have completed the twelfth project in the cabinet-installation sequence: installing cabinet doors, drawer fronts, and hinges. This project required you to install concealed hinges to the specified configuration (CB-067), hang doors without collision (CB-068), align door reveals using the manufacturer's adjustment sequence (CB-069), install aligned drawer fronts (CB-070), adjust hinge and slide hardware including soft-close devices (CB-071), and inspect and document door and drawer operation (CB-072).
You now have a cabinet run with aligned, secured, and tested doors and drawer fronts. That confirmed reveal and alignment carries directly into the next project: laying out and drilling pulls and knobs from a repeatable hardware template.
Protect the confirmed reveals, hinge adjustments, and slide settings established in this project. Project 13 measures its hardware template directly from the alignment confirmed here.