Practical Trades Manual Series
|
Book 29 — Welding Fundamentals: Safety, Cutting, SMAW, MIG, TIG, Flux-Core, Joint Fit-Up, and Weld Inspection

Chapter 13

Weld with Flux-Core Wire

Configure an approved flux-cored welding setup — self-shielded or gas-shielded — and produce a documented series of flat-position FCAW practice beads with correct wire, polarity, parameters, slag control, cleaning, and inspection.

Field Cue System

These cues appear at the point of work. They identify safety, code, manufacturer, and measurement issues before they become fires, injuries, or failed inspections.

△

Safety Cue

Task-specific safety guidance for ordinary work hazards.

✋

Critical Safety Cue

Serious injury, fire, or major damage is possible.

⛑

Field Safety Cue

Practical work-area safety: lighting, cords, footing, and housekeeping.

▤

Code Alert

Local requirements vary. Verify permit, inspection, and jurisdictional rules.

▧

Manufacturer Cue

Follow product-specific instructions for tools, materials, and equipment.

▱

Measurement Cue

Clearance, boundary, spacing, and reference-point guidance.

Job Overview

This chapter qualifies you to configure an approved flux-cored arc welding (FCAW) setup — either self-shielded or gas-shielded, as specified by the approved wire and procedure — and to produce a documented series of flat-position practice beads on identified mild-steel coupons with correct wire installation, polarity, parameters, slag removal, and inspected bead quality.

You will identify the wire type required by the approved procedure, install and feed the correct flux-cored electrode, verify polarity, connect and leak-check shielding gas where the wire requires it, set voltage and wire-feed speed from the approved chart, run a short test bead on scrap, then produce and inspect a series of flat-position stringer beads while managing the heavier slag coating characteristic of flux-cored welding.

This chapter builds directly on the wire-feed setup skills from Chapter 10 and the bead-running skills from Chapter 11, applied to a process that shares equipment with GMAW but is never treated as an interchangeable technique.

Skills You Will Demonstrate

  • WF-073 — Set up FCAW equipment, including wire installation, feed system, and gas connection where required.
  • WF-074 — Select flux-core wire by classification, diameter, and polarity requirement matched to the approved procedure.
  • WF-075 — Adjust machine voltage and wire-feed speed settings within the approved starting range.
  • WF-076 — Run flat-position flux-core beads with controlled travel, angle, and contact-tip-to-work distance.
  • WF-077 — Remove slag completely from flux-core welds using approved chipping and brushing methods.
  • WF-078 — Inspect flux-core bead consistency, including width, tie-in, porosity, and slag-inclusion indicators.

Where This Skill Fits

Chapter 13 depends on the welding-area authorization from Chapter 1, the PPE selection from Chapter 2, the equipment-identification and readiness record from Chapter 3, and the prepared coupons from Chapters 4 through 6. It applies the wire-feeder setup pattern taught in Chapter 10 and the bead-control technique taught in Chapter 11 to flux-cored wire, which carries different polarity, slag, and fume characteristics than solid GMAW wire.

The parameter-verification, slag-management, and defect-analysis habits built in this chapter carry forward into Chapter 16 through Chapter 20, where any process — SMAW, GMAW, or FCAW — may be selected for fit-up, fabrication, and the capstone project.

Scope and Intended Use

This chapter covers:

  • identifying whether the approved procedure calls for self-shielded or gas-shielded flux-cored wire
  • installing the approved flux-cored electrode with matched drive rolls, polarity, and (where required) shielding gas
  • setting voltage and wire-feed speed from the approved starting chart and verifying with a test bead
  • running flat-position stringer beads with controlled contact-tip-to-work distance, travel, and angle
  • removing slag completely and inspecting bead consistency, including porosity and slag-inclusion indicators

This chapter does not authorize the learner to:

  • select machine parameters, wire classification, diameter, or gas mixture beyond what the approved wire manufacturer, welding procedure specification, or instructor supplies
  • weld out-of-position, on coated, painted, galvanized, or unidentified metal, or on any joint configuration not covered by this chapter's flat-position bead exercise
  • treat FCAW technique as interchangeable with SMAW, GMAW, or GTAW technique from earlier or later chapters
  • proceed without ventilation appropriate to the specific wire, since flux-cored processes can generate significant fume volume

Any test bead, parameter setting, or bead that fails the inspection criteria in this chapter must be corrected before proceeding to production beads or advancing to Chapter 14.

Reference Conventions

Establish these references before setup begins, and do not change them without re-verifying the affected portion of the setup.

TermDefinition
Self-shielded FCAWFlux-cored process that requires no external shielding gas; the flux core alone protects the weld pool
Gas-shielded FCAWFlux-cored process that requires an external shielding gas in addition to the flux core
Contact-tip-to-work distanceThe measured distance from the gun contact tip to the work surface, controlled per the approved procedure for the wire in use
Wire extension (stickout)The length of wire extending beyond the contact tip before the arc; trimmed to the specified length before starting
Slag inclusion indicatorA visible surface condition suggesting slag may be trapped beneath or within the weld bead
Worm trackA surface ripple pattern on a flux-cored bead that can indicate porosity beneath the surface

FCAW Setup Record

Before striking any test or practice arc, record the following on the parameter log:

Wire type (self-shielded / gas-shielded): ______________________     Classification: ______________________     Diameter: ______________________

Polarity: ______________________     Shielding gas (if applicable): ______________________     Flow rate: ______________________

Voltage: ______________________     Wire-feed speed: ______________________     Contact-tip-to-work distance: ______________________

Machine ID: ______________________     Coupon ID: ______________________     Builder/learner name: ____________

Prerequisites

Common Field Fundamentals

Flux-cored welding shares its power source and wire-feed hardware with GMAW, but the process is not interchangeable with it. The flux core changes polarity requirements, fume volume, slag behavior, and — for self-shielded wire — eliminates the external gas system entirely.

Wire identificationClassification, diameter, and self-shielded or gas-shielded type from the approved procedure
Feeder and gun setupMatched drive rolls, liner, contact tip, and nozzle for the selected wire
Gas system (if required)Cylinder, regulator, flowmeter, and leak-checked connections for gas-shielded wire only
Parameter verificationVoltage and wire-feed speed confirmed with a test bead before production beads
Bead techniqueControlled contact-tip-to-work distance, travel, and work/travel angle
Slag managementComplete removal between beads using chipping and brushing
Fume and ventilationAssessed for the specific wire; flux-cored processes can generate substantial fume
InspectionBead width, tie-in, porosity, worm tracks, and slag-inclusion indicators

Self-Shielded Versus Gas-Shielded Wire

Confirm which type of flux-cored wire the approved procedure specifies before beginning any setup step. Self-shielded wire requires no external gas system; gas-shielded wire requires a leak-checked gas system in addition to the flux core. Installing the wrong nozzle configuration, drive rolls, or polarity for the selected wire produces an unstable arc and unacceptable bead quality regardless of how carefully the voltage and wire-feed speed are set.

WF-073 – WF-078

Process Setup / Welding Practice

Flux-Core Setup and Flat-Position Practice Beads

Difficulty: Intermediate

Estimated Time: 3–4 hours

Estimated Cost: Wire, gas where required, and coupons

Finished Work: A documented FCAW station and a set of inspected flat-position practice beads

A. Finished-Project Specification

Outcome: one correctly configured FCAW station — self-shielded or gas-shielded per the approved procedure — and a set of flat-position stringer beads on identified mild-steel coupons, produced with verified parameters, controlled technique, complete slag removal, and documented visual inspection.

B. Setup and Bead Schedule (Component Schedule)

ItemQuantitySpecification SourceSetup/Acceptance Condition
Flux-cored wire1 spoolApproved wire manufacturer classification and diameterDry, identified, undamaged, correct feed direction
Drive rollsMatched setFeeder manufacturer, matched to wire type and diameterCorrect groove profile, tension per starting condition
Shielding gas (gas-shielded wire only)1 cylinderWire manufacturer gas requirementCorrect label, secured upright, leak-checked connections
Test bead1 minimumApproved starting parameter chartStable arc, acceptable spatter, approved before production beads
Practice couponsPer instructor assignmentChapter 4–6 prepared mild-steel couponsClean bright metal, marked bead lines and endpoints
Production beadsPer instructor assignmentThis chapter's procedureConsistent width, tie-in, complete slag removal, passed inspection

C. Material Takeoff

  • Wire: one spool of the approved flux-cored classification and diameter, sufficient for the required test and production beads.
  • Shielding gas: for gas-shielded wire only, one cylinder of the gas specified by the wire manufacturer, with sufficient volume for the setup leak check and all practice beads.
  • Base metal: identified flat mild-steel coupons from Chapters 4 through 6, sufficient for one test bead and the number of production beads assigned by the instructor.
  • Consumables: contact tips and nozzle sized for the approved wire diameter and shielding configuration.
  • Fastener and hardware schedule: not applicable. This chapter produces practice beads, not a fastened assembly.

D. Acceptance Standards

CheckStandard
Wire and polarityMatches the approved procedure's classification, diameter, and polarity before any arc is struck
Gas system (if applicable)Leak-checked, correct gas, flow set within the approved starting range
Test beadStable arc, acceptable spatter and slag behavior, approved before production beads begin
Bead width and reinforcementConsistent along the bead length within the approved procedure's range
Tie-in and toe transitionSmooth fusion into the base metal without undercut or overlap
Slag removalComplete along the full bead length; no slag inclusion indicators visible after brushing
Porosity and worm tracksNone visible on the finished, cleaned bead surface
Starts, stops, and cratersControlled per the approved crater-control method; no uncontrolled arc strikes

E. Preparation — Wire and Procedure Review

  1. Identify whether the approved process uses self-shielded or gas-shielded flux-cored wire. Confirm the determination against the welding procedure specification or instructor direction before continuing.
  2. Review wire classification, diameter, polarity, gas where applicable, contact tip, drive roll, material, and parameter range. Record each value on the FCAW Setup Record.
  3. Confirm ventilation and respiratory requirements for the selected wire and material. Reassess local exhaust positioning for the specific fume volume expected from this wire.
  4. Complete hot-work, PPE, fire, and area controls. Confirm the Chapter 1 readiness record remains current for this session.

F. Feeder and Wire Installation

  1. Turn off and isolate the machine before feeder setup. Confirm the machine is de-energized before opening the wire compartment.
  2. Inspect spool, wire, drive rolls, guides, liner, gun, contact tip, and nozzle. Confirm each component matches the selected wire type and diameter.
  3. Install the approved wire in the correct feed direction. Verify the spool label against the recorded classification and diameter before installing.
  4. Use drive rolls appropriate to the wire without crushing or deforming it. Confirm the groove profile matches the wire type.
  5. Set spool brake and drive tension to approved starting conditions. Record the starting tension setting.
  6. Verify polarity from the wire manufacturer information. Confirm output-terminal connections match the required polarity before energizing.

G. Shielding Gas Setup (Gas-Shielded Wire) or Configuration (Self-Shielded Wire)

  1. For gas-shielded FCAW, secure and connect the approved gas system. Confirm the cylinder is upright, secured, and labeled for the correct gas.
  2. Check gas connections for leakage. Use the approved leak-check method at every fitting.
  3. Set gas flow only to the approved starting range. Record the flow rate on the FCAW Setup Record.
  4. For self-shielded FCAW, remove or configure gas components as directed by the machine and wire instructions. Confirm the nozzle configuration matches the self-shielded setup.

H. Parameter Setting and Test Bead

  1. Set voltage and wire-feed speed from the approved chart. Record both settings on the FCAW Setup Record.
  2. Trim wire to the specified extension. Confirm the trimmed length matches the procedure before striking an arc.
  3. Attach the work clamp to clean metal. Confirm clamp contact is sound and close to the test location.
  4. Prepare and mark the flat coupon. Mark bead lines and endpoints per the procedure.
  5. Perform a wire-feed and gas check. Confirm smooth feed and, for gas-shielded wire, correct flow before striking an arc.
  6. Run a short test bead on matching scrap. Complete the test bead under instructor authorization before proceeding.
  7. Inspect arc stability, slag, spatter, bead shape, and shielding. Compare the test bead against the acceptance standards in Section D.
  8. Adjust only within the approved parameter range. Record any adjustment and the reason for it.

I. Running Flat-Position Practice Beads

  1. Position the coupon flat and assume a stable stance. Confirm clear travel access along the full marked bead line.
  2. Use the approved drag or travel technique for the wire. Confirm the technique matches the wire manufacturer's guidance rather than defaulting to GMAW technique.
  3. Maintain contact-tip-to-work distance. Hold the distance recorded in Section H throughout the bead.
  4. Maintain work and travel angles. Confirm both angles against the approved procedure.
  5. Travel steadily while observing the puddle and slag. Watch the slag trailing behind the puddle as an indicator of stable travel speed.
  6. Terminate the bead using approved crater control. Avoid an abrupt arc break that leaves an uncontrolled crater.

J. Slag Removal and Inspection

  1. Allow the bead to cool before slag removal. Confirm the bead has cooled sufficiently for safe handling unless the procedure permits hot chipping.
  2. Wear eye and face protection while chipping slag. Confirm safety glasses and face shield are in place before chipping begins.
  3. Remove slag completely and brush the bead. Inspect the full bead length for any remaining slag before brushing is considered complete.
  4. Inspect bead width, reinforcement, tie-in, undercut, overlap, porosity, slag inclusion indicators, worm tracks, spatter, and crater. Compare findings against the acceptance standards in Section D.
  5. Compare multiple beads for consistency. Identify any bead-to-bead variation and its likely cause.
  6. Identify whether defects relate to voltage, wire speed, stickout, travel, angle, contamination, gas, or wire condition. Record the probable cause for any rejected bead.
  7. Make approved corrections one variable at a time. Do not change more than one parameter or technique element between beads.
  8. Record wire, polarity, gas, settings, technique, defects, and accepted result. Complete the parameter log for every bead produced.

K. Shutdown

  1. Close gas where used, shut down equipment, store wire, and complete fire watch. Confirm the cylinder valve is closed, the machine is de-energized, and the required post-work monitoring period is observed before leaving the area.

Common Area Inspection

Inspect the FCAW station and finished beads using the same checks regardless of whether the wire is self-shielded or gas-shielded.

Complete the Flux-Core Welding Inspection Checklist below before advancing to Chapter 14.

Image Placeholder
Recommended image: correctly matched drive rolls and liner installed for the approved flux-cored wire diameter.
Image Placeholder
Recommended image: a self-shielded FCAW gun nozzle configuration compared with a gas-shielded FCAW gun nozzle configuration.
Image Placeholder
Recommended image: a stable flux-core arc with slag trailing correctly behind the puddle during travel.
Image Placeholder
Recommended image: correct eye and face protection positioned during slag chipping.
Image Placeholder
Recommended image: a completed flux-core bead after full slag removal and brushing, showing acceptable width and tie-in.
Image Placeholder
Recommended image: a completed FCAW parameter log recording wire, polarity, gas, and bead-inspection results.

Failure Points and Troubleshooting

Cleanup

This chapter ends with a documented, inspected set of practice beads, not a finished assembly. Housekeeping here protects the parameter log and the FCAW station for the next session.

Field Terms

Self-Shielded FCAW
Flux-cored process that requires no external shielding gas.
Gas-Shielded FCAW
Flux-cored process that requires an external shielding gas in addition to the flux core.
Contact-Tip-to-Work Distance
The measured distance from the gun contact tip to the work surface.
Wire Extension (Stickout)
The length of wire extending beyond the contact tip before the arc.
Slag Inclusion Indicator
A visible surface condition suggesting slag may be trapped beneath or within the weld bead.
Worm Track
A surface ripple pattern that can indicate subsurface porosity.
Crater Control
The approved method for terminating a bead without leaving an uncontrolled depression at the stop.
Parameter Log
The record of wire, polarity, gas, voltage, wire speed, technique, and inspection results for each bead produced.

Skill Check

  1. Why must you confirm whether the approved procedure calls for self-shielded or gas-shielded wire before beginning any setup step?
  2. What happens to arc stability and bead quality if the machine polarity does not match the selected flux-cored wire's requirement?
  3. Why is a test bead required before production beads even when voltage and wire-feed speed are taken directly from the approved chart?
  4. Why does flux-cored welding require more attention to slag removal than solid-wire GMAW welding?
  5. What ventilation concern is specific to flux-cored wire, particularly self-shielded wire, that may not apply to other processes covered earlier in this book?
  6. What does a worm track on the bead surface suggest, and what corrective actions should be checked first?
  7. Why must contact-tip-to-work distance be confirmed for the specific wire rather than assumed from the GMAW distance used in Chapter 11?
  8. What must happen before more than one parameter or technique variable is changed between beads?
  9. Why must the drive rolls and liner be matched to the specific flux-cored wire rather than reused from a prior GMAW setup without verification?
  10. What must be recorded in the parameter log for every bead produced, and why does that record matter for later chapters?

Competency Rubric

CompetencyIndependent Pass StandardNot DemonstratedWith AssistanceIndependently
WF-073Correctly sets up FCAW equipment, including wire installation, feed system, and gas connection where required
WF-074Selects flux-core wire matching classification, diameter, and polarity to the approved procedure
WF-075Sets and verifies machine voltage and wire-feed speed within the approved starting range using a test bead
WF-076Runs flat-position flux-core beads with controlled travel, angle, and contact-tip-to-work distance
WF-077Removes slag completely from flux-core welds using approved chipping and brushing methods
WF-078Correctly inspects flux-core bead consistency, identifying porosity and slag-inclusion indicators against acceptance standards

Mark one column per competency. Only Demonstrated Independently awards the competency; Demonstrated with Assistance authorizes additional supervised practice but does not complete the requirement.

Inspection Checklist — Flux-Core Welding Inspection Checklist

ItemStandardPass (Y/N)Correction (if any)
Wire type and classificationMatches approved procedure; correctly identified as self-shielded or gas-shielded
PolarityMatches wire manufacturer requirement, verified before energizing
Gas system (if applicable)Leak-checked, correct gas, flow within approved starting range
Test beadStable arc, acceptable spatter and slag, approved before production beads
Contact-tip-to-work distanceMatches approved procedure and held consistently through each bead
Bead width and reinforcementConsistent within approved range
Tie-in and toesSmooth fusion, no undercut or overlap
Slag removalComplete along full bead length; no inclusion indicators after brushing
Porosity and worm tracksNone visible on finished bead
Starts, stops, and cratersControlled per approved method

Beads accepted: ______ (Pass/Fail)     Evaluator signature: ____________________     Date: ____________     Builder/learner name: ____________

Performance Check

With the practice beads complete, review the finished coupons against the Acceptance Standards table and confirm wire, polarity, and gas settings match the approved procedure, the test bead was approved before production beads began, contact-tip-to-work distance and travel technique were held consistently, slag was completely removed from every bead, and no porosity, worm tracks, or slag-inclusion indicators remain visible. Complete the Flux-Core Welding Inspection Checklist and correct any failed item before advancing to Chapter 14.

Chapter Closeout

You have completed the flux-core welding chapter in the welding fundamentals sequence. This chapter required you to set up FCAW equipment including wire installation, feed system, and gas connection where required (WF-073), select flux-core wire matching classification, diameter, and polarity to the approved procedure (WF-074), adjust machine voltage and wire-feed speed within the approved starting range (WF-075), run flat-position flux-core beads with controlled travel, angle, and contact-tip-to-work distance (WF-076), remove slag completely using approved chipping and brushing methods (WF-077), and inspect flux-core bead consistency for porosity and slag-inclusion indicators (WF-078).

You now have a documented FCAW station setup and a set of inspected practice beads. That process knowledge carries forward into the fit-up, fabrication, and capstone chapters, where SMAW, GMAW, or FCAW may be selected as the approved production process.

Store the completed parameter log and inspection checklist with your other project records. The next chapter shifts to a different process entirely: assembling and preparing a GTAW station.