Chapter 4
Install self-adhered ice-and-water membrane at required eaves, valleys, and vulnerable transitions on a deck that has already received required eave drip edge, achieving the manufacturer-controlled coverage, laps, and adhesion before synthetic underlayment and shingles begin.
These cues appear at the point of work. They identify safety, code, manufacturer, and measurement issues before they become rework or hazards.
Task-specific safety guidance for ordinary work hazards.
Serious injury, fall, or major damage is possible.
Practical work-area safety: footing, weather, housekeeping, and access.
Local requirements vary. Verify permit, inspection, and jurisdictional rules.
Follow product-specific instructions for materials, fastening schedules, and equipment.
Slope, span, clearance, and reference-point guidance.
This chapter qualifies you to install self-adhered ice-and-water shield membrane at required eaves, valleys, and vulnerable transitions on a roof deck that has already passed the Chapter 1 readiness inspection and received the eave drip edge required by Chapter 3. The finished work product is a fully adhered membrane system covering the required interior distance at eaves, running the full length of every valley from low point to high point, integrated at corners and plane changes without fishmouths or reverse laps, and documented with product, lot, weather, and inspection records.
You will confirm the substrate is clean and dry, apply primer only where the manufacturer requires it, plan membrane widths and courses so the required coverage is achieved without an unsupported seam, install the membrane from a straight eave reference and from the low point of each valley toward the high point, treat every corner and transition without trapped air or reverse laps, seal approved penetrations and cuts, and inspect the completed membrane for wrinkles, voids, and adhesion failure before it is covered by synthetic underlayment.
This chapter follows Chapter 3 and precedes Chapter 5. The eave metal installed in Chapter 3 must already be in place beneath this membrane. The synthetic underlayment installed in Chapter 5, and the rake drip edge that Chapter 3 completes over that underlayment, both depend on the membrane installed here being continuous, adhered, and free of defects.
This chapter sits between the roof-edge metal installed in Chapter 3 and the synthetic underlayment installed in Chapter 5. Eave drip edge required below the membrane must already be complete and accepted before this chapter begins. The membrane installed here becomes the last line of defense against ice-dam backup at eaves and against concentrated water flow in valleys, positions that ordinary underlayment laps alone do not adequately protect.
Every later chapter that crosses a membrane-protected area — synthetic underlayment in Chapter 5, valley shingles in Chapter 9, and any flashing chapter that meets a membrane-covered eave or valley — must integrate with this membrane in shingle-lap order rather than disturb or bridge it.
This chapter covers:
This chapter does not authorize the learner to:
Any deck area, corner, or transition that cannot be membraned to the manufacturer's required geometry with the tools and access available must be recorded as a deficiency and escalated before it is covered.
Establish these references before recording any finding, and use them consistently across the installation and inspection records.
| Term | Definition |
|---|---|
| Eave coverage distance | The required interior distance the membrane must extend from the exterior wall line or other controlling reference identified by the roofing-system specification |
| Course | One continuous run of membrane installed edge-to-edge with adjoining runs at the required side lap |
| End lap | The overlap between the end of one membrane length and the beginning of the next length in the same course |
| Side lap | The overlap between the long edge of one course and the long edge of the adjoining course |
| Low point / high point (valley) | The lower and upper ends of a valley run; membrane installation begins at the low point and proceeds toward the high point |
| Fishmouth | A gap or lifted edge at a lap or corner where the membrane has not fully bonded, creating an open water path |
| Bridging | Membrane spanning a plane change, corner, or deck irregularity without full contact, leaving an unsupported void beneath the sheet |
Before beginning installation, record the controlling documents and site identification directly on the membrane installation record:
Project / address: ______ Roofing-system specification revision: ______ Chapter 1 readiness decision reference: ______ Chapter 3 eave drip-edge acceptance reference: ______
Membrane product: ____________ Lot number(s): ____________ Date started: ____________ Installer name: ____________
Self-adhered membrane depends on two things the installer directly controls: a clean, dry substrate and correct sequencing from low point to high point, or from eave to interior, so every lap sheds water onto the layer below it. A membrane installed out of sequence, or onto a contaminated surface, will not achieve the adhesion the manufacturer's coverage and lap dimensions assume, regardless of how carefully it is rolled.
Inspect the deck for dust, moisture, frost, oil, loose fibers, protrusions, gaps, and damaged sheathing before staging any membrane. Clean and dry the substrate using methods permitted by the membrane manufacturer. Apply compatible primer only where the manufacturer requires it, and allow the primer to reach the specified condition before membrane placement begins.
Do not install self-adhered membrane outside the manufacturer's specified deck-surface and ambient-temperature range. If cold-weather application is permitted, follow the manufacturer's warming method and equipment for both the membrane and the substrate. Do not substitute an unapproved heat source or extend application into conditions the manufacturer's instructions exclude.
Membrane installation at eaves places workers near an unprotected edge while handling a slick, adhesive-backed material. Confirm fall protection accepted under Chapter 2 is in place before working within the fall-protection zone, and keep footing clear of loose release film, which becomes a slip hazard on any roof surface.
Stop membrane installation in wind conditions that make sheet control unsafe or that could pull an unrolled length toward a roof edge before it is pressed into place. Keep release film contained; do not allow it to blow off the roof or accumulate underfoot.
Measure the required eave coverage from the exterior wall line or other controlling reference identified in the roofing-system specification, not from the fascia or drip-edge outer edge. Plan membrane widths and course locations so the required interior coverage is achieved without relying on an unsupported seam at the coverage line.
RF-019 – RF-024
Membrane Installation / Water-Control Preparation
Deliverable: continuous, fully adhered self-adhered membrane covering the required interior eave distance and the complete length of every required valley from low point to high point, with side laps, end laps, and corner transitions installed at the manufacturer-controlled dimension, penetrations and cuts sealed with compatible accessories, defects repaired, and product, lot, weather, and inspection information recorded.
| Document | Confirmed Current | Notes |
|---|---|---|
| Roofing-system specification | ||
| Membrane manufacturer's product instructions | ||
| Climate / coverage requirement reference | ||
| Chapter 1 roofing-readiness decision | ||
| Chapter 3 eave drip-edge acceptance record | ||
| Valley detail (open, closed-cut, or woven, as applicable to later chapters) |
| Check | Standard |
|---|---|
| Eave drip-edge prerequisite | Confirmed complete and accepted before membrane installation begins |
| Substrate condition | Clean, dry, and free of frost, oil, loose fibers, protrusions, gaps, and damaged sheathing, or each item corrected before membrane placement |
| Primer | Applied only where required by the manufacturer and allowed to reach the specified condition before membrane placement |
| Eave coverage distance | Meets or exceeds the required interior distance measured from the controlling reference, without an unsupported seam |
| Valley installation | Installed from the low point toward the high point, centered or positioned per the approved detail |
| Side laps and end laps | Meet or exceed the manufacturer-controlled minimum overlap at every course and length transition |
| Corners and transitions | Free of fishmouths, reverse laps, and trapped air |
| Penetrations and cuts | Sealed using manufacturer-approved patches or accessories at approved locations only |
| Surface condition | Free of wrinkles, voids, fishmouths, contamination, inadequate laps, bridging, and poor adhesion, or each item corrected and rechecked |
| Documentation | Product, lot, weather conditions, locations, laps, repairs, and inspection results recorded before Chapter 5 begins |
Apply the same checks to every eave and valley area receiving membrane, regardless of roof size or configuration.
Complete the Membrane Installation and Inspection Record in the Inspection Checklist section below before beginning Chapter 5.
Probable cause: deck temperature or ambient temperature outside the manufacturer's application range, contaminated or damp substrate, or missing required primer.
Confirmation: check the deck-surface and ambient temperature against the manufacturer's specified range, and reinspect the substrate for moisture, dust, or oil at the affected location.
Correction: remove and discard the affected membrane section per the manufacturer's instructions, re-clean or dry the substrate, apply primer if required, and reinstall using a new section once conditions are within range.
Reinspection: press-test the reinstalled section and confirm full contact before continuing adjoining courses.
Probable cause: the lap was pressed from one direction only, trapping air, or the corner transition was not formed to the manufacturer's detail.
Confirmation: inspect the lap or corner for a visible gap or lifted edge and check the lap dimension against the manufacturer's minimum.
Correction: lift the affected area only as far as necessary, re-press from the center outward, and install a manufacturer-approved patch over the corrected area if the sheet was disturbed beyond simple re-pressing.
Reinspection: recheck the lap or corner for full contact and confirm no remaining gap before covering the area.
Probable cause: the coverage measurement was taken from the wrong reference, or the course plan did not account for the full required interior distance.
Confirmation: remeasure the installed coverage from the exterior wall line or other controlling reference identified in the roofing-system specification.
Correction: install an additional course extending the coverage to the required distance, lapping onto the existing membrane by the manufacturer-controlled minimum.
Reinspection: recheck the extended coverage against the required distance and record the correction.
Probable cause: installation began at the wrong end of the valley, or successive lengths were placed without confirming which piece must shed onto which.
Confirmation: inspect the valley run from the low point to the high point and identify any lap oriented against the water-flow direction.
Correction: remove and reinstall the affected length in the correct sequence per the manufacturer's instructions; do not attempt to correct a reverse lap with sealant alone.
Reinspection: recheck the full valley run for consistent low-to-high lap direction before installing secondary strips or shingles.
Probable cause: the membrane was stretched during placement, or debris was trapped beneath the sheet before pressing.
Confirmation: inspect the wrinkle or void visually and by hand pressure to confirm the extent of the unbonded area.
Correction: cut and remove the affected area per the manufacturer's repair instructions, remove any trapped debris, and install a patch of the manufacturer-specified dimension and lap sequence.
Reinspection: press-test the patch and confirm full adhesion before the area is covered by underlayment.
Probable cause: a penetration was relocated or added after the Chapter 1 inspection without an approved change document.
Confirmation: compare the observed penetration location to the Chapter 1 roof sketch and any approved change documents.
Correction: stop sealing the penetration, record the discrepancy as a deficiency, and route it to the responsible authority for an approved change document before continuing.
Reinspection: reseal the penetration once an approved change document is issued.
This chapter ends with a fully adhered, inspected membrane system and a complete installation record, not loose release film and unlogged repairs.
| Competency | Independent Pass Standard | Not Demonstrated | With Assistance | Independently |
|---|---|---|---|---|
| RF-019 | Prepares the deck surface for membrane, including cleaning, drying, and primer application only where required, without proceeding on a contaminated or damp substrate | |||
| RF-020 | Installs eave membrane to the required interior coverage distance without stretching or wrinkling the sheet | |||
| RF-021 | Installs valley membrane from the low point toward the high point with correct centering and geometry per the approved detail | |||
| RF-022 | Achieves the manufacturer-controlled minimum side lap and end lap at every course and length transition, including corners and transitions | |||
| RF-023 | Seals only approved penetrations, fastener heads, and membrane cuts using manufacturer-approved patches or accessories | |||
| RF-024 | Inspects the completed membrane for wrinkles, voids, fishmouths, contamination, inadequate laps, bridging, and poor adhesion, and corrects every defect found |
Mark one column per competency. Only Demonstrated Independently awards the competency; Demonstrated with Assistance authorizes additional supervised practice but does not complete the requirement.
| Item | Condition Found | Correction Required | Corrected (Y/N) | Reinspection Result |
|---|---|---|---|---|
| Substrate condition (cleaning / drying) | ||||
| Primer application (where required) | ||||
| Eave coverage distance — Eave 1 | ||||
| Eave coverage distance — Eave 2 | ||||
| Valley membrane — low-to-high sequence | ||||
| Side laps | ||||
| End laps | ||||
| Corners and plane-change transitions | ||||
| Penetration and cut sealing | ||||
| Surface condition (wrinkles / voids / fishmouths / bridging) |
Membrane installation decision: ______ (Accepted / Accepted with Listed Corrections / Stop-Work) Date: ____________ Installer name: ____________
With the installation complete, review the Membrane Installation and Inspection Record against the Acceptance Standards table and confirm the eave drip-edge prerequisite was verified, the substrate was clean and dry with primer applied only where required, eave coverage meets or exceeds the required interior distance at every eave, valley membrane was installed from low point to high point at every required valley, every side lap and end lap meets the manufacturer-controlled minimum, every corner and transition is free of fishmouths and reverse laps, every approved penetration and cut is sealed, and every identified defect has been corrected and rechecked. Sign the membrane installation decision before beginning Chapter 5.
You have completed the fourth chapter in the roof-installation sequence: installing self-adhered ice-and-water shield membrane at required eaves, valleys, and vulnerable transitions. This chapter required you to prepare the substrate for membrane (RF-019), install eave membrane to the required coverage distance (RF-020), install valley membrane from low point to high point (RF-021), overlap courses and transitions correctly (RF-022), seal approved penetrations and cuts (RF-023), and inspect and correct the completed membrane (RF-024).
You now have a fully adhered, inspected membrane system in place over every deck area the roofing-system specification identifies as requiring it. That membrane carries directly into the next chapter: installing continuous synthetic underlayment over the deck and this membrane, maintaining the same low-to-high, shingle-lap water path this chapter established.
Store the completed membrane installation record with the project record. Chapter 5 requires this record before synthetic underlayment begins.