Project 09
Integrate the installed Project 08 prehung exterior door with the water-resistive barrier (WRB), sill pan, jamb flashing, head flashing, threshold seal, interior air seal, and exterior trim backing, without blocking the door's designed drainage paths.
These cues appear at the point of work. They identify safety, code, manufacturer, and measurement issues before they become rework, disputes, or concealed defects.
Task-specific safety guidance for ordinary work hazards.
Serious injury or major structural consequence is possible.
Practical work-area safety: footing, debris, access, and exposure.
Local requirements vary. Verify permit, inspection, and jurisdictional rules.
Follow product-specific instructions for flashing, sealant, and foam.
Clearance, dimension, tolerance, and reference-point guidance.
This project qualifies you to complete the concealed water-control and air-seal assembly around the prehung exterior door set and function-tested in Project 08. The finished work product is a flashed, drained, air-sealed, and operational exterior-door installation, together with photographs and records of every concealed detail, ready to receive the rainscreen furring, siding, and trim covered in later projects in this book.
You will review the controlling instructions, confirm the door remains plumb, square, and operational, protect the sill-pan drainage path, install jamb flashing tied into the sill pan, install head flashing and integrate the WRB head flap over it, seal only the designated frame, threshold, and trim joints, install approved exterior trim backing, air-seal the interior perimeter gap without disturbing operation, inspect every layer, and photograph the completed assembly before it is concealed by rainscreen and siding.
This project follows directly from Project 08, which set and function-tested the prehung door, and it precedes Project 10, which installs the rainscreen furring and drainage mat over the completed WRB. A door that is flashed but not correctly drained, or sealed in a location that blocks the sill pan or threshold weeps, becomes a concealed defect that the Project 19 full exterior water-control inspection must trace back to this project.
Project 07 built the drained sill pan, and Project 08 set and function-tested the door in that opening. This project completes the water-control loop by tying jamb and head flashing into that sill pan and into the surrounding WRB, so that water striking the door assembly from any direction is shed outward and downward without reaching the rough opening or the interior. The interior air seal completed here also controls air leakage at the frame perimeter, which is separate from — and must not interfere with — the exterior drainage path.
The shingle-lap discipline used here (sill pan, then jambs, then head, then WRB head flap) is the same drainage logic used at every window and penetration flashing detail in this book, including Project 4 through 6 for windows and Project 16 for wall penetrations.
This project covers:
This project does not authorize the learner to:
Any condition that shows a reverse lap, blocked drainage, incompatible sealant, bowed jamb, or failed adhesion must be corrected before concealment. Stop work and obtain qualified review for any structural or door-operation issue outside this project's authorized scope.
Establish these references before any flashing, sealing, or air-sealing work begins, and do not change them once the assembly has been inspected and documented.
| Term | Definition |
|---|---|
| Frame flange or flashing flange | The door-frame surface or attached flange that receives jamb and head flashing layers |
| End dam | A raised or formed component at the end of the head flashing that directs water inward away from the jamb rather than off the end |
| Sill-pan upturn | The vertical leg of the Project 07 sill pan that extends up each jamb and receives the jamb flashing overlap |
| WRB head flap | The section of water-resistive barrier above the opening that is temporarily secured during Project 02 and integrated over the head flashing in this project |
| Designated joint | A joint identified by the sealant schedule as requiring sealant; all other joints, laps, and drainage openings remain unsealed unless the schedule states otherwise |
| Interior air-seal gap | The perimeter gap between the door frame and the rough opening, sealed from the interior with backer rod, sealant, or low-expansion foam |
Before beginning any flashing or sealing work, record the controlling instructions and reference data directly on the door-flashing inspection record:
Door location/ID: ______ Flashing product and lot: ______ Head-flashing component: ______ Sealant product and lot: ______
Date started: ____________ Installer name: ____________
Every concealed water-control assembly in this book — window flashing in Projects 4 through 6, door flashing in this project, and wall-penetration flashing in Project 16 — follows the same shingle-lap order: the lowest layer is installed first and every layer above overlaps the layer below, so water always sheds onto a layer that is already prepared to receive it. Learning that order at the door reinforces the same discipline used at every other opening and penetration in this book.
The exterior flashing and drainage path and the interior air-seal gap serve two different functions and must never be merged. The sill-pan outlet and threshold weeps drain bulk water and must remain open at all times. The interior air-seal gap controls air leakage and is completed only from the interior, after the exterior flashing has passed inspection. Do not use interior foam or sealant as a substitute for a missing or incomplete exterior flashing layer, and do not seal the exterior drainage outlet to reduce air leakage.
Extend head flashing beyond both jambs by the projection distance specified in the flashing manufacturer's instructions, and overlap jamb flashing onto the sill-pan upturns by the distance specified in the sill-pan and flashing instructions. Do not estimate these dimensions by eye; measure and record each one on the door-flashing inspection record.
Do not tape, caulk, or otherwise seal across the sill-pan outlet or threshold weeps unless the approved system specifically requires it. Sealing a designed drainage opening traps water at the sill and threshold, creating a concealed water path directly beneath the door that is far more difficult to diagnose once trim and siding are installed.
Use approved ladders, scaffolds, or platforms for head-flashing installation above the approved fall-protection threshold. Do not stand on the door threshold, an open door slab, or an unsecured platform while installing head flashing or WRB head-flap integration.
Confirm that the selected flashing tape or membrane, primer, sealant, and low-expansion foam are identified as compatible with the door frame material, the WRB, and the sill-pan material by the applicable manufacturer instructions. Do not substitute a generic tape, sealant, or foam not identified as compatible.
Requirements for a localized water-control observation or test after this assembly is complete vary by jurisdiction and project specification. Verify the current requirement, approved protocol, and required cure conditions with the authority having jurisdiction and the general contractor before conducting any observation or test.
BE-049 – BE-054
Flashing / Sealing / Air-Sealing Qualification
Scope: one completed concealed water-control and air-seal assembly at one Project 08 prehung exterior door, including jamb flashing, head flashing, WRB head-flap integration, designated sealant joints, exterior trim backing, and interior air sealing.
| Document | Source | Confirmation Required |
|---|---|---|
| Door manufacturer instructions | Door manufacturer | Frame-flashing sequence and prohibited sealant locations confirmed |
| WRB and flashing manufacturer instructions | Product manufacturer | Tape width, primer requirement, and lap dimensions confirmed |
| Head-flashing detail | Design professional / manufacturer | End-dam type, projection, and extension confirmed |
| Sealant schedule | Design professional / project specification | Designated joints and prohibited locations confirmed |
| Trim-system instructions | Design professional / manufacturer | Trim-backing method and rainscreen interface confirmed |
| Project 08 door acceptance record | Prior project record | Confirmed passed before flashing begins |
| Check | Standard |
|---|---|
| Door condition before concealment | Plumb, square, correct reveal, functioning latch, and threshold bearing confirmed |
| Jamb flashing | Bottom-to-top order, full contact, required overlap onto sill-pan upturns, no wrinkles or fishmouths |
| Head flashing | Required end dams, projection, and extension beyond jambs, integrated beneath the WRB head flap |
| Sealant joints | Sealant present only at designated frame-to-pan, threshold-to-floor, and threshold-end joints; drainage openings remain open |
| Trim backing | Installed without interrupting rainscreen drainage or cladding support continuity |
| Interior air seal | Backer rod, sealant, or foam installed without bowing the frame; door remains operational during and after installation |
| Documentation completeness | Photographs and records of every concealed detail completed before rainscreen or siding installation begins |
Inspect the completed door-flashing assembly using the same checks regardless of door location.
Complete the Door-Flashing Inspection Record in the Inspection Checklist section below before beginning Project 10.
Probable cause: flashing was applied without full contact against an irregular surface, or tension in the tape distorted the jamb during rolling.
Confirmation: visually inspect for voids behind the flashing and recheck jamb plumb against the Project 08 record.
Correction: remove the affected section, correct the substrate condition, and reapply flashing with full contact using a J-roller.
Reinspection: repeat the contact and plumb check at the corrected location.
Probable cause: the head-flashing component was cut to the opening width rather than to the specified projection, or end dams were omitted during fabrication.
Confirmation: measure the installed projection beyond each jamb and inspect for end-dam presence and orientation.
Correction: remove and replace the head flashing with a correctly sized and formed component before installing the WRB head flap.
Reinspection: repeat the projection and end-dam check before proceeding to WRB integration.
Probable cause: sealant was applied along the entire threshold joint rather than only at the designated locations identified on the sealant schedule.
Confirmation: inspect the full threshold length against the sealant schedule and confirm the drainage outlet location.
Correction: remove the sealant from the drainage opening without damaging the sill pan, and confirm the outlet is fully clear.
Reinspection: repeat the drainage-path check after correction and before trim backing is installed.
Probable cause: low-expansion foam overfilled the perimeter gap and expanded against the frame, or backer rod was overcompressed against the jamb.
Confirmation: operate the door and compare current reveal and latch engagement against the Project 08 acceptance record.
Correction: remove the excess foam or backer rod causing the distortion and reapply using the manufacturer's specified bead size or rod diameter.
Reinspection: repeat the door-operation check immediately after correction and again after full cure.
Probable cause: the head flap was folded under the head flashing instead of over it, or the flap was cut too short to fold down completely.
Confirmation: inspect the lap direction at the head flashing to confirm water sheds outward and onto the flashing rather than behind it.
Correction: remove the reversed flap section, extend or replace the WRB as required, and reinstall the flap in shingle-lap order over the head flashing.
Reinspection: repeat the lap-direction check before trim backing conceals the detail.
Probable cause: trim backing was installed flush against the WRB without maintaining the rainscreen gap established in Project 10, or backing was sized wider than the approved detail.
Confirmation: measure the drainage gap behind the trim backing at multiple points and compare against the approved rainscreen detail.
Correction: remove and replace the backing with correctly sized material that preserves the specified gap.
Reinspection: repeat the gap measurement after correction and before Project 10 furring is installed around the opening.
This project ends with a flashed, drained, air-sealed, and operational exterior-door installation, documented and ready for rainscreen furring, not with siding or trim installed.
| Competency | Independent Pass Standard | Not Demonstrated | With Assistance | Independently |
|---|---|---|---|---|
| BE-049 | Flashes door jambs from bottom to top with required overlap onto sill-pan upturns without bridging gaps or displacing the frame | |||
| BE-050 | Installs head flashing with required end dams, projection, and extension, correctly integrated with the WRB head flap | |||
| BE-051 | Seals only designated frame-to-pan and threshold joints while keeping sill-pan outlet and threshold weeps open | |||
| BE-052 | Integrates the WRB with jamb and head flashing in correct shingle-lap order and patches exposed discontinuities | |||
| BE-053 | Installs approved trim backing without interrupting drainage and air-seals the interior gap without affecting door operation | |||
| BE-054 | Inspects, corrects, and documents the completed concealed door-flashing assembly with photographs and records |
Mark one column per competency. Only Demonstrated Independently awards the competency; Demonstrated with Assistance authorizes additional supervised practice but does not complete the requirement.
| Check | Plan Value / Requirement | Field Value | Within Tolerance (Y/N) | Correction (if any) |
|---|---|---|---|---|
| Door plumb/square/reveal/operation | Matches Project 08 acceptance record | |||
| Sill-pan drainage before covering | Open and undamaged | |||
| Jamb flashing overlap onto sill pan | Matches manufacturer-specified distance | |||
| Head-flashing projection beyond jambs | Matches manufacturer-specified distance | |||
| WRB head-flap integration | Shingle-lap order over head flashing | |||
| Sealant locations | Present only at designated joints | |||
| Sill-pan outlet/threshold weeps | Open and unobstructed | |||
| Trim backing and rainscreen gap | Drainage cavity preserved | |||
| Interior air seal | Installed without bowing frame; door operational | |||
| Documentation | Photographs and records complete before Project 10 |
Open discrepancies attached: ____________ Responsible authority for each: ____________
Assembly status: ______ (Proceed to Project 10/Conditional-Proceed/Stop-Work) Date: ____________ Installer name: ____________
With document review, jamb flashing, head flashing, WRB integration, designated sealant, trim backing, and interior air sealing complete, review the assembly against the Acceptance Standards table and confirm the door remains plumb, square, and operational, jamb and head flashing are correctly lapped and dimensioned, sealant is present only at designated joints with all drainage openings clear, trim backing preserves the rainscreen cavity, and the interior air seal does not affect operation. Complete and sign the door-flashing inspection record before rainscreen furring is installed in Project 10. If a discrepancy remains open, identify the responsible authority and required correction before proceeding.
You have completed the ninth project in the building-envelope sequence: flashing and weatherproofing an exterior door. This project required you to flash door jambs with the required overlap onto the sill-pan upturns (BE-049), install head flashing with the required end dams and projection (BE-050), seal only the designated frame and threshold joints while keeping drainage open (BE-051), integrate the WRB with the flashing in correct shingle-lap order (BE-052), install trim backing and complete the interior air seal without affecting operation (BE-053), and inspect, correct, and document the completed assembly (BE-054).
You now have a flashed, drained, air-sealed, and operational exterior-door installation with a signed door-flashing inspection record. That decision carries directly into the next project: installing the rainscreen furring and drainage mat over the completed WRB and this door assembly.
Protect the completed jamb flashing, head flashing, sealant joints, and interior air seal established in this project. Project 10 installs rainscreen furring around this opening and depends on every drainage and clearance condition confirmed here.